Bridge high pier climbing frame and tower crane integrated system
The invention belongs to the technical field of climbing frames for bridge pier pouring, and particularly relates to a bridge high pier climbing frame and tower crane integrated system which comprises a tower crane and a bridge high pier climbing frame. The tower crane comprises a lower tower body, an upper tower body and a cargo boom from bottom to top; the lower tower body is installed on the middle platform, the lower tower body is fixedly connected with the formwork, and the cargo boom is higher than the upper end of the formwork; the bridge high pier climbing frame has the advantages that the small tower crane and the bridge high pier climbing frame are integrated, and the small tower crane can ascend and descend along with the bridge high pier climbing frame; compared with a floor type tower crane, the construction efficiency can be improved, and the construction cost can be reduced; (2) a concrete pump pipe conveying construction mode is replaced, and several construction difficulties existing in concrete pumping are solved; (3) the lower tower body is fixedly connected with the formwork, and the two sides, in the width direction, of the lower tower body of the tower crane are fixedly or detachably connected with the adjacent cross bridging correspondingly; and the use safety of the tower crane on the climbing frame is ensured.
本发明属于桥墩浇筑用爬架技术领域,具体涉及一种桥梁高墩爬架和塔吊集成系统,桥梁高墩爬架和塔吊集成系统包括塔吊和桥梁高墩爬架;所述塔吊包括自下而上的下塔身、上塔身和起重臂;所述下塔身安装在中平台上,所述下塔身与模架固定连接,所述起重臂高于模架上端;本发明的优点和积极效果在于:(1)将小型塔吊和桥梁高墩爬架集成为一体,小型塔吊能够随桥梁高墩爬架一起升降;相比于采用落地式塔吊能够提高施工效率和减少施工费用;(2)替代混凝土泵管输送的施工方式,解决了泵送混凝土存在的几个施工难点;(3)下塔身与模架固定连接,塔吊的下塔身宽度方向两侧分别与邻近的剪刀撑固定或可拆卸连接;使得确保了爬架上塔吊使用的安全性。
Bridge high pier climbing frame and tower crane integrated system
The invention belongs to the technical field of climbing frames for bridge pier pouring, and particularly relates to a bridge high pier climbing frame and tower crane integrated system which comprises a tower crane and a bridge high pier climbing frame. The tower crane comprises a lower tower body, an upper tower body and a cargo boom from bottom to top; the lower tower body is installed on the middle platform, the lower tower body is fixedly connected with the formwork, and the cargo boom is higher than the upper end of the formwork; the bridge high pier climbing frame has the advantages that the small tower crane and the bridge high pier climbing frame are integrated, and the small tower crane can ascend and descend along with the bridge high pier climbing frame; compared with a floor type tower crane, the construction efficiency can be improved, and the construction cost can be reduced; (2) a concrete pump pipe conveying construction mode is replaced, and several construction difficulties existing in concrete pumping are solved; (3) the lower tower body is fixedly connected with the formwork, and the two sides, in the width direction, of the lower tower body of the tower crane are fixedly or detachably connected with the adjacent cross bridging correspondingly; and the use safety of the tower crane on the climbing frame is ensured.
本发明属于桥墩浇筑用爬架技术领域,具体涉及一种桥梁高墩爬架和塔吊集成系统,桥梁高墩爬架和塔吊集成系统包括塔吊和桥梁高墩爬架;所述塔吊包括自下而上的下塔身、上塔身和起重臂;所述下塔身安装在中平台上,所述下塔身与模架固定连接,所述起重臂高于模架上端;本发明的优点和积极效果在于:(1)将小型塔吊和桥梁高墩爬架集成为一体,小型塔吊能够随桥梁高墩爬架一起升降;相比于采用落地式塔吊能够提高施工效率和减少施工费用;(2)替代混凝土泵管输送的施工方式,解决了泵送混凝土存在的几个施工难点;(3)下塔身与模架固定连接,塔吊的下塔身宽度方向两侧分别与邻近的剪刀撑固定或可拆卸连接;使得确保了爬架上塔吊使用的安全性。
Bridge high pier climbing frame and tower crane integrated system
一种桥梁高墩爬架和塔吊集成系统
GAO GUANWEI (author) / WEI XIN (author) / FAN SHIXIAO (author) / LI GUANGZHUANG (author) / LU GUANGFU (author) / CHEN ZUWEI (author) / ZHU SHAOYONG (author) / WANG KUN (author) / HAN XIAOLONG (author)
2023-09-08
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge high pier column climbing frame dismantling method
European Patent Office | 2023
|Limiting device in climbing process of bridge high pier climbing frame
European Patent Office | 2023
|Tower crane pedestrian passage structure on climbing frame
European Patent Office | 2020
|Bridge pier climbing frame turnover construction device and construction method
European Patent Office | 2024
|