A platform for research: civil engineering, architecture and urbanism
Sliding-lifting type high pier tie beam formwork support system and construction method
The invention discloses a sliding-lifting type high pier tie beam formwork support system and a construction method thereof. The sliding-lifting type high pier tie beam formwork support system comprises a prefabricated support winch hoister arranged on the opposite inner side of a main pier winch hoister, and the prefabricated support winch hoister is connected with a winch hoister winch hoister through a sliding-lifting rope winch hoister. The method has the advantages of being fast in construction operation, capable of shortening the construction period, high in machine tool utilization rate, small in risk coefficient and small in main pier damage.
本发明公开了一种滑升式高墩系梁模板支架系统及其施工方法,包括有设于主墩卷扬提升机相对内侧的预制支架卷扬提升机,预制支架卷扬提升机经滑升绳索卷扬提升机连接有卷扬提升机卷扬提升机。本发明具有施工作业快,缩短施工周期,机具利用率高,风险系数小,主墩损伤小的特点。
Sliding-lifting type high pier tie beam formwork support system and construction method
The invention discloses a sliding-lifting type high pier tie beam formwork support system and a construction method thereof. The sliding-lifting type high pier tie beam formwork support system comprises a prefabricated support winch hoister arranged on the opposite inner side of a main pier winch hoister, and the prefabricated support winch hoister is connected with a winch hoister winch hoister through a sliding-lifting rope winch hoister. The method has the advantages of being fast in construction operation, capable of shortening the construction period, high in machine tool utilization rate, small in risk coefficient and small in main pier damage.
本发明公开了一种滑升式高墩系梁模板支架系统及其施工方法,包括有设于主墩卷扬提升机相对内侧的预制支架卷扬提升机,预制支架卷扬提升机经滑升绳索卷扬提升机连接有卷扬提升机卷扬提升机。本发明具有施工作业快,缩短施工周期,机具利用率高,风险系数小,主墩损伤小的特点。
Sliding-lifting type high pier tie beam formwork support system and construction method
一种滑升式高墩系梁模板支架系统及施工方法
HU LANG (author) / LIU MINGJUN (author) / LIU XIAOFAN (author) / AN NING (author) / WU HANG (author) / XIONG XUNFEI (author) / CHEN LEI (author) / FENG ZHENGCHENG (author) / LU QINGSHAN (author) / LIU HANXIN (author)
2020-06-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Intelligent formwork sliding and lifting system for thin-wall hollow high pier construction
European Patent Office | 2024
|Truss integral lifting type bridge high pier creeping formwork device and construction method
European Patent Office | 2020
|High pier hydraulic self-lifting formwork structure and construction technology
European Patent Office | 2023
|Gate-type pier cross beam construction method and formwork
European Patent Office | 2021
|Urban high-pier support-free formwork turnover construction method
European Patent Office | 2015
|