A platform for research: civil engineering, architecture and urbanism
Device for dismantling bailey beam and construction method thereof
The invention discloses a device for dismantling a bailey beam. The device comprises a beam frame and a bottom plate, a driving mechanism used for providing power is fixedly connected to the right side of the upper surface of the beam frame, a plurality of shaft sleeves are rotatably connected to the middle of the upper surface of the beam frame, transmission mechanisms matched with the driving mechanism are arranged in the shaft sleeves, and a limiting mechanism used for clamping the bottom plate is arranged at the lower end of the bottom plate. The invention further provides a construction method for dismantling the bailey beam. The construction method comprises the following steps that S1, installation is conducted; s2, fixing is conducted; s3, starting an integral lowering system; s4,dismounting is conducted; s5, recovery. The bailey beam dismantling device is reasonable in structure and ingenious in design, the bailey beam needing to be dismantled can be hoisted firstly and dismantled in the mode that the bailey beam is dismantled integrally from bottom to top, long-term operation in a high-altitude narrow space is avoided, and the construction safety is greatly improved.
本发明公开了一种用于拆除贝雷梁的装置,包括梁架与底板,所述梁架的上表面右侧固定连接有用于提供动力的驱动机构,所述梁架的上表面中部转动连接有多个轴套,多个所述轴套内设有与驱动机构配合的传动机构,所述底板的下端设有用于卡紧底板的限位机构。本发明还提出了一种用于拆除贝雷梁的施工方法,包括以下步骤:S1,安装;S2,固定;S3,启动整体下放系统;S4,拆除;S5,回收。本发明结构合理,设计巧妙,可以将需要拆除的贝雷梁先行吊起,采用先下后上整体拆除的方式进行拆解,进而避免了在高空狭小空间长期作业,大幅度提高了施工安全性。
Device for dismantling bailey beam and construction method thereof
The invention discloses a device for dismantling a bailey beam. The device comprises a beam frame and a bottom plate, a driving mechanism used for providing power is fixedly connected to the right side of the upper surface of the beam frame, a plurality of shaft sleeves are rotatably connected to the middle of the upper surface of the beam frame, transmission mechanisms matched with the driving mechanism are arranged in the shaft sleeves, and a limiting mechanism used for clamping the bottom plate is arranged at the lower end of the bottom plate. The invention further provides a construction method for dismantling the bailey beam. The construction method comprises the following steps that S1, installation is conducted; s2, fixing is conducted; s3, starting an integral lowering system; s4,dismounting is conducted; s5, recovery. The bailey beam dismantling device is reasonable in structure and ingenious in design, the bailey beam needing to be dismantled can be hoisted firstly and dismantled in the mode that the bailey beam is dismantled integrally from bottom to top, long-term operation in a high-altitude narrow space is avoided, and the construction safety is greatly improved.
本发明公开了一种用于拆除贝雷梁的装置,包括梁架与底板,所述梁架的上表面右侧固定连接有用于提供动力的驱动机构,所述梁架的上表面中部转动连接有多个轴套,多个所述轴套内设有与驱动机构配合的传动机构,所述底板的下端设有用于卡紧底板的限位机构。本发明还提出了一种用于拆除贝雷梁的施工方法,包括以下步骤:S1,安装;S2,固定;S3,启动整体下放系统;S4,拆除;S5,回收。本发明结构合理,设计巧妙,可以将需要拆除的贝雷梁先行吊起,采用先下后上整体拆除的方式进行拆解,进而避免了在高空狭小空间长期作业,大幅度提高了施工安全性。
Device for dismantling bailey beam and construction method thereof
一种用于拆除贝雷梁的装置及其施工方法
LI SHENGFEI (author) / XIA LIANYING (author) / WANG XIAODONG (author) / PANG PING (author) / LIU KEWEI (author) / SHI HUATAO (author) / WANG JUPENG (author) / ZOU PENGCHENG (author)
2020-06-16
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bailey beam dismantling device in bridge engineering and construction method thereof
European Patent Office | 2023
|Bailey beam dismantling construction method in bridge engineering
European Patent Office | 2020
|European Patent Office | 2024
|Bailey beam dismantling and transporting device and construction method applying same
European Patent Office | 2020
|