One-time outer wall scaffold erecting and fixing technology
The invention discloses a one-time outer wall scaffold erecting and fixing technology, and relates to the technical field of constructional engineering. The one-time outer wall scaffold erecting and fixing technology includes the following steps that S1, embedded fixing parts are machined and manufactured, the lengths of the embedded fixing parts are not less than 300 mm, and holes with the diameters phi being 14 are drilled in the end portions of the embedded fixing parts; and S2, connecting frame body short steel pipes are machined and manufactured. According to the one-time outer wall scaffold erecting and fixing technology, the one-time overall outer wall scaffold frame body fixing technology method is adopted as for the defects and deficiencies of various existing conventional building system engineering outer wall scaffold erecting and fixing technology methods, thus, artificial destruction generated as a scaffold blocks process construction in the later working process is reduced, the integrity and the firmness of a scaffold frame body are guaranteed, the construction efficiency is improved, the construction period is shortened, the construction cost is reduced, potential safety hazards of the scaffold frame body are eliminated, and the stubborn problem that potential safety hazards are caused as the scaffold frame body is fixed secondarily is solved.
本发明公开了一种一次性外墙脚手架搭设固定技术,涉及建筑工程技术领域。该一次性外墙脚手架搭设固定技术,包括如下步骤:S1、加工制作预埋固定件,其长度不得少于300㎜,并在预埋固定件端部钻一φ14洞眼;S2、加工制作连接架体短钢管。该一次性外墙脚手架搭设固定技术,针对现有常规的各类建筑系统工程外墙脚手架搭设固定技术方法的缺陷和不足,而采取的一种一次性整体固定外墙脚手架架体的技术方法,从而减少后期作业过程中因阻碍工序施工而遭受人为破坏,保证了脚手架架体的完整性、牢固性,提高了施工效率,缩短了工期,降低了施工成本,消除了脚手架架体安全隐患,克服了因脚手架架体二次固定带来安全隐患的顽疾。
One-time outer wall scaffold erecting and fixing technology
The invention discloses a one-time outer wall scaffold erecting and fixing technology, and relates to the technical field of constructional engineering. The one-time outer wall scaffold erecting and fixing technology includes the following steps that S1, embedded fixing parts are machined and manufactured, the lengths of the embedded fixing parts are not less than 300 mm, and holes with the diameters phi being 14 are drilled in the end portions of the embedded fixing parts; and S2, connecting frame body short steel pipes are machined and manufactured. According to the one-time outer wall scaffold erecting and fixing technology, the one-time overall outer wall scaffold frame body fixing technology method is adopted as for the defects and deficiencies of various existing conventional building system engineering outer wall scaffold erecting and fixing technology methods, thus, artificial destruction generated as a scaffold blocks process construction in the later working process is reduced, the integrity and the firmness of a scaffold frame body are guaranteed, the construction efficiency is improved, the construction period is shortened, the construction cost is reduced, potential safety hazards of the scaffold frame body are eliminated, and the stubborn problem that potential safety hazards are caused as the scaffold frame body is fixed secondarily is solved.
本发明公开了一种一次性外墙脚手架搭设固定技术,涉及建筑工程技术领域。该一次性外墙脚手架搭设固定技术,包括如下步骤:S1、加工制作预埋固定件,其长度不得少于300㎜,并在预埋固定件端部钻一φ14洞眼;S2、加工制作连接架体短钢管。该一次性外墙脚手架搭设固定技术,针对现有常规的各类建筑系统工程外墙脚手架搭设固定技术方法的缺陷和不足,而采取的一种一次性整体固定外墙脚手架架体的技术方法,从而减少后期作业过程中因阻碍工序施工而遭受人为破坏,保证了脚手架架体的完整性、牢固性,提高了施工效率,缩短了工期,降低了施工成本,消除了脚手架架体安全隐患,克服了因脚手架架体二次固定带来安全隐患的顽疾。
One-time outer wall scaffold erecting and fixing technology
一种一次性外墙脚手架搭设固定技术
ZHANG XUNLAI (author)
2020-06-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Method for erecting outer scaffold of concrete cantilever structure and outer scaffold device
European Patent Office | 2020
|European Patent Office | 2024
|Outer wall cornice formwork and formwork erecting method
European Patent Office | 2023
|