A platform for research: civil engineering, architecture and urbanism
Water conservancy project vertical water stop structure and water conservancy project vertical water stop construction method
The invention relates to a water conservancy project vertical water stop structure and a water conservancy project vertical water stop construction method, and belongs to the technical field of waterconservancy projects. The water conservancy project vertical water stop structure comprises a dam body, wherein the top wall of the dam body is provided with at least two groups of installation grooves in the vertical direction; each group of installation grooves comprises a plurality of installation grooves distributed at intervals in the length direction of the dam body; every two adjacent groups of installation grooves are arranged in a staggered manner; a waterproof component is detachably arranged in each installation groove; an opening of each installation groove is provided with a coverplate used for sealing the installation groove; a drain pipe communicating with the corresponding installation groove is arranged in each cover plate in a penetrating mode; and a visible pipe communicates with one end, extending out of the corresponding installation groove, of each drain pipe. If one of the waterproof components is damaged, water in a river channel can penetrate into the corresponding installation groove, because the installation groove is in a closed state, water in the installation groove can enter the corresponding visible pipe through the corresponding drain pipe under water pressure, maintenance personnel can replace and maintain the waterproof component corresponding to the visual pipe with water instead of maintaining the waterproof components of the whole dam body, and therefore the maintenance is simple, and the maintenance cost is reduced.
本发明涉及一种水利工程垂直止水结构及其施工方法,属于水利工程技术领域,包括坝体,坝体的顶壁沿竖直方向开设有安装槽,安装槽至少设置两组,每组均包括沿坝体的长度方向间隔分布的多个安装槽,相邻两组的安装槽错位设置,安装槽内可拆卸设置有防水组件;安装槽的槽口处设置有用密封安装槽的盖板,盖板内穿设有与安装槽连通的排水管,排水管伸出安装槽外的一端连通有可视管。若防水组件损坏,将导致河道内的水渗入安装槽内,因安装槽处于封闭状态,在水压下,安装槽内的水会通过排水管进入到可视管内;检修人员即可对有水的可视管对应的防水组件进行更换维修;无需对整个坝体的防水组件进行维修;维修简单,降低维护成本。
Water conservancy project vertical water stop structure and water conservancy project vertical water stop construction method
The invention relates to a water conservancy project vertical water stop structure and a water conservancy project vertical water stop construction method, and belongs to the technical field of waterconservancy projects. The water conservancy project vertical water stop structure comprises a dam body, wherein the top wall of the dam body is provided with at least two groups of installation grooves in the vertical direction; each group of installation grooves comprises a plurality of installation grooves distributed at intervals in the length direction of the dam body; every two adjacent groups of installation grooves are arranged in a staggered manner; a waterproof component is detachably arranged in each installation groove; an opening of each installation groove is provided with a coverplate used for sealing the installation groove; a drain pipe communicating with the corresponding installation groove is arranged in each cover plate in a penetrating mode; and a visible pipe communicates with one end, extending out of the corresponding installation groove, of each drain pipe. If one of the waterproof components is damaged, water in a river channel can penetrate into the corresponding installation groove, because the installation groove is in a closed state, water in the installation groove can enter the corresponding visible pipe through the corresponding drain pipe under water pressure, maintenance personnel can replace and maintain the waterproof component corresponding to the visual pipe with water instead of maintaining the waterproof components of the whole dam body, and therefore the maintenance is simple, and the maintenance cost is reduced.
本发明涉及一种水利工程垂直止水结构及其施工方法,属于水利工程技术领域,包括坝体,坝体的顶壁沿竖直方向开设有安装槽,安装槽至少设置两组,每组均包括沿坝体的长度方向间隔分布的多个安装槽,相邻两组的安装槽错位设置,安装槽内可拆卸设置有防水组件;安装槽的槽口处设置有用密封安装槽的盖板,盖板内穿设有与安装槽连通的排水管,排水管伸出安装槽外的一端连通有可视管。若防水组件损坏,将导致河道内的水渗入安装槽内,因安装槽处于封闭状态,在水压下,安装槽内的水会通过排水管进入到可视管内;检修人员即可对有水的可视管对应的防水组件进行更换维修;无需对整个坝体的防水组件进行维修;维修简单,降低维护成本。
Water conservancy project vertical water stop structure and water conservancy project vertical water stop construction method
一种水利工程垂直止水结构及其施工方法
DU YI (author) / HE LINQUAN (author) / ZHOU XIN (author) / CAO WUJUAN (author)
2020-06-26
Patent
Electronic Resource
Chinese
Water conservancy project vertical water stop structure and construction method thereof
European Patent Office | 2021
|Water conservancy project vertical water stop structure and construction method thereof
European Patent Office | 2023
|Vertical water stop structure for water conservancy project and construction method thereof
European Patent Office | 2021
|Vertical water stop structure for water conservancy project and construction method thereof
European Patent Office | 2020
|Water conservancy project aqueduct joint water stop device
European Patent Office | 2021
|