A platform for research: civil engineering, architecture and urbanism
Complete mold adjusting mechanism of movable mold frame and construction method of complete mold adjusting mechanism
The invention discloses a complete mold adjusting mechanism of a movable mold frame and a construction method of the complete mold adjusting mechanism. The complete mold adjusting mechanism comprisesa lower adjusting device and a lower adjusting device, wherein the lower adjusting device comprises a support hind limb, a support fore limb and a slideway piece, the top end of the support fore limbis higher than the support fore limb, the slideway piece is fixedly connected to the top ends of the support hind limb and the support fore limb, and an ejector rod and a rotating lead screw pushing the ejector rod are slidably arranged at the end, close to the support fore limb, in the slideway piece; and the upper adjusting device comprises a circular hoop, a first threaded rod, a threaded pipe,a second threaded rod and a hinged support, and the threaded pipe rotationally adjusts the length of the upper adjusting device. Through cooperative movement of the lower adjusting device and the upper adjusting device, the overall transverse movement of the vertical formwork is achieved like a mechanical arm on a movable frame body, so that the fine adjustment and checking effects of a wall formwork are achieved, the construction is convenient, the efficiency is high, and the problems that in concrete structure construction, mechanical rapid construction cannot be achieved during vertical component formwork installation and the problems of formwork installation quality and precision requirements are solved.
本发明公开了一种移动模架的成套调模机构及其施工方法,包括下部调节装置和下部调节装置;下部调节装置包括支架后肢、支架前肢和滑道件,支架前肢的顶端高于支架前肢,滑道件固定连接在支架后肢和支架前肢的顶端,滑道件内靠近支架前肢的一端滑移设置有顶杆以及推动顶杆的转动丝杆;上部调节装置包括圆箍、第一螺纹杆、螺纹管、第二螺纹杆和铰支座,螺纹管转动调节上部调节装置的长度。通过下部与上部调节装置的配合移动,如同移动架体上的机械臂一般实现竖向模板的整体横向移动,从而达到墙体模板微调与校核的效果,施工方便,效率高,解决了混凝土结构施工中竖向构件模板安装的无法实现机械化快速施工的问题及模板安装质量及精度要求的问题。
Complete mold adjusting mechanism of movable mold frame and construction method of complete mold adjusting mechanism
The invention discloses a complete mold adjusting mechanism of a movable mold frame and a construction method of the complete mold adjusting mechanism. The complete mold adjusting mechanism comprisesa lower adjusting device and a lower adjusting device, wherein the lower adjusting device comprises a support hind limb, a support fore limb and a slideway piece, the top end of the support fore limbis higher than the support fore limb, the slideway piece is fixedly connected to the top ends of the support hind limb and the support fore limb, and an ejector rod and a rotating lead screw pushing the ejector rod are slidably arranged at the end, close to the support fore limb, in the slideway piece; and the upper adjusting device comprises a circular hoop, a first threaded rod, a threaded pipe,a second threaded rod and a hinged support, and the threaded pipe rotationally adjusts the length of the upper adjusting device. Through cooperative movement of the lower adjusting device and the upper adjusting device, the overall transverse movement of the vertical formwork is achieved like a mechanical arm on a movable frame body, so that the fine adjustment and checking effects of a wall formwork are achieved, the construction is convenient, the efficiency is high, and the problems that in concrete structure construction, mechanical rapid construction cannot be achieved during vertical component formwork installation and the problems of formwork installation quality and precision requirements are solved.
本发明公开了一种移动模架的成套调模机构及其施工方法,包括下部调节装置和下部调节装置;下部调节装置包括支架后肢、支架前肢和滑道件,支架前肢的顶端高于支架前肢,滑道件固定连接在支架后肢和支架前肢的顶端,滑道件内靠近支架前肢的一端滑移设置有顶杆以及推动顶杆的转动丝杆;上部调节装置包括圆箍、第一螺纹杆、螺纹管、第二螺纹杆和铰支座,螺纹管转动调节上部调节装置的长度。通过下部与上部调节装置的配合移动,如同移动架体上的机械臂一般实现竖向模板的整体横向移动,从而达到墙体模板微调与校核的效果,施工方便,效率高,解决了混凝土结构施工中竖向构件模板安装的无法实现机械化快速施工的问题及模板安装质量及精度要求的问题。
Complete mold adjusting mechanism of movable mold frame and construction method of complete mold adjusting mechanism
一种移动模架的成套调模机构及其施工方法
LIU XIAOFEI (author) / GE QINGHE (author) / HU LEISONG (author)
2020-06-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Internal mold support adjusting method, internal mold support device and tower drum mold
European Patent Office | 2024
|MOLD FRAME, AND MOLD FRAME SYSTEM INCLUDING MOLD FRAME AND LIFTING DEVICE FOR LIFTING MOLD FRAME
European Patent Office | 2020
|