A platform for research: civil engineering, architecture and urbanism
Fabricated concrete mixing station bin and installation method thereof
The invention relates to a fabricated concrete mixing station bin and an installation method thereof. The bin comprises at least two bin bodies arranged side by side, wherein each bin body comprises abounding wall, a top support and an awning; the bounding walls are fixed on the ground; the top supports are detachably assembled on the bounding walls so as to form roof frames; the awnings are detachably paved on the top supports; and the two bin bodies are arranged in a conjoined way through multiple Y-shaped support units. The fabricated concrete mixing station bin is arranged in the conjoined way through the Y-shaped support units so as to be good in connecting performance, stable, reliable, and fast and convenient in assembling manner; the gap between two adjacent conjoined bodies is narrower, so that no extra space is occupied, and a building area can be enlarged; and the bin is completely fabricated, light in weight and convenient to disassemble and build, and has the characteristics of high efficiency, safety, easiness in operation and low cost.
一种装配式混凝土拌合站料仓及其安装方式,该料仓包括至少两个并排设置的仓体,每个仓体包括围墙、顶部支架和篷布,所述围墙固定于地面上,所述顶部支架可拆卸式装配于围墙上形成屋面框架,所述篷布可拆卸式铺设于顶部支架上,且所述两个仓体之间通过复数个Y型支撑单元连体式设置。采用Y型支撑单元连体式设置,连接性能好,稳固可靠,装配方式快捷方便,且连体间距较窄,不占用额外空间,能扩大建筑面积,该料仓完全装配式、轻型、便于拆搭,具有高效、安全、易操作、低成本的特点。
Fabricated concrete mixing station bin and installation method thereof
The invention relates to a fabricated concrete mixing station bin and an installation method thereof. The bin comprises at least two bin bodies arranged side by side, wherein each bin body comprises abounding wall, a top support and an awning; the bounding walls are fixed on the ground; the top supports are detachably assembled on the bounding walls so as to form roof frames; the awnings are detachably paved on the top supports; and the two bin bodies are arranged in a conjoined way through multiple Y-shaped support units. The fabricated concrete mixing station bin is arranged in the conjoined way through the Y-shaped support units so as to be good in connecting performance, stable, reliable, and fast and convenient in assembling manner; the gap between two adjacent conjoined bodies is narrower, so that no extra space is occupied, and a building area can be enlarged; and the bin is completely fabricated, light in weight and convenient to disassemble and build, and has the characteristics of high efficiency, safety, easiness in operation and low cost.
一种装配式混凝土拌合站料仓及其安装方式,该料仓包括至少两个并排设置的仓体,每个仓体包括围墙、顶部支架和篷布,所述围墙固定于地面上,所述顶部支架可拆卸式装配于围墙上形成屋面框架,所述篷布可拆卸式铺设于顶部支架上,且所述两个仓体之间通过复数个Y型支撑单元连体式设置。采用Y型支撑单元连体式设置,连接性能好,稳固可靠,装配方式快捷方便,且连体间距较窄,不占用额外空间,能扩大建筑面积,该料仓完全装配式、轻型、便于拆搭,具有高效、安全、易操作、低成本的特点。
Fabricated concrete mixing station bin and installation method thereof
一种装配式混凝土拌合站料仓及其安装方式
LI ZHIJUN (author) / MA WEI (author) / ZHOU WEI (author) / ZHANG JUAN (author)
2020-07-03
Patent
Electronic Resource
Chinese
Fabricated concrete building and installation method thereof
European Patent Office | 2020
|Fabricated concrete mixing station stock bin partition wall and mounting method thereof
European Patent Office | 2020
|European Patent Office | 2021
|Fabricated concrete prefabricated part installation construction method
European Patent Office | 2021
|GIS equipment modular fabricated concrete groove foundation and installation method thereof
European Patent Office | 2020
|