Rapid earthwork construction method in lakeside plain wetland area
The invention belongs to the technical field of infrastructure engineering, and relates to a rapid earthwork construction method in a lakeside plain wetland area. The method comprises the steps of one-site measurement, software calculation partitioning, surface soil stripping, land leveling, the next process and the like. The method not only overcomes the defects of high labor consumption, slow construction progress and the like of a conventional method, but also most importantly, is beneficial to controlling smoothness of earthwork excavation, simplifying the construction process, accelerating the construction progress, reducing the construction cost, reducing the labor allocation, realizing efficient construction and providing powerful guarantee for construction quality.
本发明属于基础设施工程技术领域,涉及一种滨湖平原湿地地区土方快速化施工方法,现场测量;软件计算分块;表土剥离;土地整平;下道工序等步骤,不仅解决常规方法劳力消耗多,施工进度慢等弊端,同时最重要的是有利于土方开挖平整度控制、减化施工工艺、加快施工进度、降低施工成本,减少劳动力配置,高效施工的同时为施工质量提供了有力的保障。
Rapid earthwork construction method in lakeside plain wetland area
The invention belongs to the technical field of infrastructure engineering, and relates to a rapid earthwork construction method in a lakeside plain wetland area. The method comprises the steps of one-site measurement, software calculation partitioning, surface soil stripping, land leveling, the next process and the like. The method not only overcomes the defects of high labor consumption, slow construction progress and the like of a conventional method, but also most importantly, is beneficial to controlling smoothness of earthwork excavation, simplifying the construction process, accelerating the construction progress, reducing the construction cost, reducing the labor allocation, realizing efficient construction and providing powerful guarantee for construction quality.
本发明属于基础设施工程技术领域,涉及一种滨湖平原湿地地区土方快速化施工方法,现场测量;软件计算分块;表土剥离;土地整平;下道工序等步骤,不仅解决常规方法劳力消耗多,施工进度慢等弊端,同时最重要的是有利于土方开挖平整度控制、减化施工工艺、加快施工进度、降低施工成本,减少劳动力配置,高效施工的同时为施工质量提供了有力的保障。
Rapid earthwork construction method in lakeside plain wetland area
一种滨湖平原湿地地区土方快速化施工方法
WANG HONGWEI (author) / ZHU FEI (author) / MA LONG (author) / WEN YANPING (author) / LIU ZIYANG (author)
2020-07-10
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Configuration structure and construction method for lakeside wetland vegetation buffer strand
European Patent Office | 2020
|Ecosystem Restoration of a Lakeside Wetland at Erhai
British Library Conference Proceedings | 2007
|Terraced field type lakeside wetland ecological restoration mode and implementation method
European Patent Office | 2024
|