Method for refitting a high-altitude mold at variable cross-section position of silo slip form
The invention discloses a method for refitting a high-altitude mold at a variable cross-section position of a silo slip form. Construction is carried out according to the following the procedures, andthe procedures are that lower slip form concrete is poured to the variable cross-section position; the height is lifted by 200 mm, steel bars are used for being welded to force bearing rods at the positions 100 mm away from the concrete, and an end head abuts against the inner side of an outer mold; the height is lifted by 400 mm, horizontal reinforcing steel bars are welded to the positions 600mm away from the concrete surface along the inner sides of the force bearing rods, and inclined strut reinforcing steel bars are welded between the adjacent force bearing rods; then the height is lifted by 500mm, and horizontal reinforcing steel bars are welded to the positions, 1200 mm away from the concrete surface, of the inner sides of the force bearing rods; a wood formwork is sealed at a lower opening of the outer mold, an upper opening of the wood formwork is connected with a lower opening of a steel formwork through steel bars, and a lower opening of the wood formwork is connected witha steel pipe supported on the cylinder wall; the height is lifted by 150 mm, the formworks slide, and the distance between lower openings of an inner steel formwork and an outer steel formwork and the concrete surface is 50 mm; an inner mold is disassembled and cleared; the inner mold is assembled, and an inner platform is recovered; the outer mold is disassembled and cleared; and the outer moldis assembled, and an outer platform is recovered. According to the method, the high-altitude variable-cross-section slip form mold is refitted, the construction period is shortened, the construction cost is reduced, and the safety of high-altitude refitting of the slip form is ensured.
本发明公开一种筒仓滑模变截面处高空模具改装方法,按照如下工序施工:下部滑模混凝土浇筑至变截面处;提升200mm高,在距混凝土100mm高处用钢筋焊接在承力杆上,端头顶在外模内侧;提升400mm高,在距混凝土面600mm处沿承力杆内侧焊接水平加固钢筋,相邻承力杆之间焊接斜撑加固钢筋;再提升500mm,距混凝土面1200mm位置,在承力杆内侧焊接水平加固钢筋;外模下口封木模板,木模板上口与钢模板下口通过钢筋连接,下口和支撑在筒壁钢管连接;提升150mm,模板滑空,内外钢模板下口距混凝土面50mm;拆除内模,并清理;组装内模,恢复内平台;拆除外模并清理;组装外模并恢复外平台。本发明对高空变截面滑模模具改装缩短了施工工期,降低了施工成本,确保滑模高空改装的安全。
Method for refitting a high-altitude mold at variable cross-section position of silo slip form
The invention discloses a method for refitting a high-altitude mold at a variable cross-section position of a silo slip form. Construction is carried out according to the following the procedures, andthe procedures are that lower slip form concrete is poured to the variable cross-section position; the height is lifted by 200 mm, steel bars are used for being welded to force bearing rods at the positions 100 mm away from the concrete, and an end head abuts against the inner side of an outer mold; the height is lifted by 400 mm, horizontal reinforcing steel bars are welded to the positions 600mm away from the concrete surface along the inner sides of the force bearing rods, and inclined strut reinforcing steel bars are welded between the adjacent force bearing rods; then the height is lifted by 500mm, and horizontal reinforcing steel bars are welded to the positions, 1200 mm away from the concrete surface, of the inner sides of the force bearing rods; a wood formwork is sealed at a lower opening of the outer mold, an upper opening of the wood formwork is connected with a lower opening of a steel formwork through steel bars, and a lower opening of the wood formwork is connected witha steel pipe supported on the cylinder wall; the height is lifted by 150 mm, the formworks slide, and the distance between lower openings of an inner steel formwork and an outer steel formwork and the concrete surface is 50 mm; an inner mold is disassembled and cleared; the inner mold is assembled, and an inner platform is recovered; the outer mold is disassembled and cleared; and the outer moldis assembled, and an outer platform is recovered. According to the method, the high-altitude variable-cross-section slip form mold is refitted, the construction period is shortened, the construction cost is reduced, and the safety of high-altitude refitting of the slip form is ensured.
本发明公开一种筒仓滑模变截面处高空模具改装方法,按照如下工序施工:下部滑模混凝土浇筑至变截面处;提升200mm高,在距混凝土100mm高处用钢筋焊接在承力杆上,端头顶在外模内侧;提升400mm高,在距混凝土面600mm处沿承力杆内侧焊接水平加固钢筋,相邻承力杆之间焊接斜撑加固钢筋;再提升500mm,距混凝土面1200mm位置,在承力杆内侧焊接水平加固钢筋;外模下口封木模板,木模板上口与钢模板下口通过钢筋连接,下口和支撑在筒壁钢管连接;提升150mm,模板滑空,内外钢模板下口距混凝土面50mm;拆除内模,并清理;组装内模,恢复内平台;拆除外模并清理;组装外模并恢复外平台。本发明对高空变截面滑模模具改装缩短了施工工期,降低了施工成本,确保滑模高空改装的安全。
Method for refitting a high-altitude mold at variable cross-section position of silo slip form
一种筒仓滑模变截面处高空模具改装方法
TANG ZHONG (author) / SHANG XIUMIN (author) / ZHANG JINLIAN (author)
2020-07-10
Patent
Electronic Resource
Chinese