A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of building aluminum formworks, and discloses an erecting method of an aluminum formwork supporting system. The erecting method includes the following steps that S1, a longitudinal supporting portion is built; S2, a transverse supporting portion is built; and S3, operating platforms are built. Compared with the correlation technology, according to the erecting method of the aluminum formwork supporting system, the longitudinal supporting portion is arranged, movable connection units are arranged on the longitudinal supporting portion, the transversesupporting portion is connected through the movable connection units, the positions of the movable connection units can be flexibly adjusted, movable sleeves with duplex buckles are arranged in the movable connection units, the connecting efficiency of the buckles is improved, the overall assembly efficiency can be improved, and the operating platforms at different heights can be formed accordingto the requirements.
本发明属于建筑铝模板技术领域,公开了一种铝模板支撑系统搭建方法,包括如下步骤:S1,构建纵向支撑部,S2,构建横向支撑部,S3,构建作业平台。与相关技术相比,本发明一种铝模板支撑系统搭建方法通过设置纵向支撑部及在纵向支撑部上设置活动连接单元,通过活动连接单元完成横向支撑部的连接,活动连接单元的位置可灵活调整,活动连接单元中设有具有双联扣件的活动套管,提高了扣件的连接效率,利于提高整体组装效率,且可根据需要形成不同高度的作业平台。
The invention belongs to the technical field of building aluminum formworks, and discloses an erecting method of an aluminum formwork supporting system. The erecting method includes the following steps that S1, a longitudinal supporting portion is built; S2, a transverse supporting portion is built; and S3, operating platforms are built. Compared with the correlation technology, according to the erecting method of the aluminum formwork supporting system, the longitudinal supporting portion is arranged, movable connection units are arranged on the longitudinal supporting portion, the transversesupporting portion is connected through the movable connection units, the positions of the movable connection units can be flexibly adjusted, movable sleeves with duplex buckles are arranged in the movable connection units, the connecting efficiency of the buckles is improved, the overall assembly efficiency can be improved, and the operating platforms at different heights can be formed accordingto the requirements.
本发明属于建筑铝模板技术领域,公开了一种铝模板支撑系统搭建方法,包括如下步骤:S1,构建纵向支撑部,S2,构建横向支撑部,S3,构建作业平台。与相关技术相比,本发明一种铝模板支撑系统搭建方法通过设置纵向支撑部及在纵向支撑部上设置活动连接单元,通过活动连接单元完成横向支撑部的连接,活动连接单元的位置可灵活调整,活动连接单元中设有具有双联扣件的活动套管,提高了扣件的连接效率,利于提高整体组装效率,且可根据需要形成不同高度的作业平台。
Erecting method of aluminum formwork supporting system
铝模板支撑系统搭建方法
2020-07-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork supporting system and erecting method of formwork supporting system
European Patent Office | 2024
|Building formwork erecting system and formwork erecting method
European Patent Office | 2023
|Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|