A platform for research: civil engineering, architecture and urbanism
Aluminum alloy formwork installation structure
The invention discloses an aluminum alloy formwork installation structure which comprises a first frame and a second frame. A first formwork is fixedly arranged in the first frame. A second formwork is fixedly arranged in the second frame. Three fixture blocks arranged at even intervals are fixed to each of one side of the first frame and one side of the second frame. Three connecting blocks withthe positions corresponding to those of the fixture blocks are fixed to each of the other side of the first frame and the other side of the second frame. The aluminum alloy formwork installation structure has the beneficial effects that the fixture blocks arranged on one side of the first frame, the connecting blocks arranged on one side of the second frame and rectangular grooves formed in the first frame and the second frame are in clamping connection, so that the first frame and the second frame are primarily connected; and the connecting position of the first frame and the second frame canbe conveniently sealed through an arranged upper cover board and an arranged lower cover board, and clamping grooves formed in the two ends of the lower cover board and clamping strips arranged at the two ends of the upper cover board are in clamping connection, so that the upper cover board and the lower cover board are primarily clamped.
本发明公开了一种铝合金模板安装结构,包括第一框架和第二框架,第一框架的内部固定设有第一模板,第二框架的内部固定设有第二模板,第一框架的一侧和第二框架的一侧均固定设有三个间隔均匀的卡块,第一框架的另一侧和第二框架的另一侧均固定设有三个与卡块位置相对应的连接块,本发明的有益效果是:通过第一框架一侧设置的卡块与第二框架一侧设置的连接块及其内部开设的矩形槽卡合连接,从而便于对第一框架与第二框架初步连接;通过设置的上盖板与下盖板便于对第一框架与第二框架的连接处进行密封,且通过下盖板两端开设的卡槽与上盖板两端设置的卡条卡合连接,从而使上盖板与下盖板初步卡合。
Aluminum alloy formwork installation structure
The invention discloses an aluminum alloy formwork installation structure which comprises a first frame and a second frame. A first formwork is fixedly arranged in the first frame. A second formwork is fixedly arranged in the second frame. Three fixture blocks arranged at even intervals are fixed to each of one side of the first frame and one side of the second frame. Three connecting blocks withthe positions corresponding to those of the fixture blocks are fixed to each of the other side of the first frame and the other side of the second frame. The aluminum alloy formwork installation structure has the beneficial effects that the fixture blocks arranged on one side of the first frame, the connecting blocks arranged on one side of the second frame and rectangular grooves formed in the first frame and the second frame are in clamping connection, so that the first frame and the second frame are primarily connected; and the connecting position of the first frame and the second frame canbe conveniently sealed through an arranged upper cover board and an arranged lower cover board, and clamping grooves formed in the two ends of the lower cover board and clamping strips arranged at the two ends of the upper cover board are in clamping connection, so that the upper cover board and the lower cover board are primarily clamped.
本发明公开了一种铝合金模板安装结构,包括第一框架和第二框架,第一框架的内部固定设有第一模板,第二框架的内部固定设有第二模板,第一框架的一侧和第二框架的一侧均固定设有三个间隔均匀的卡块,第一框架的另一侧和第二框架的另一侧均固定设有三个与卡块位置相对应的连接块,本发明的有益效果是:通过第一框架一侧设置的卡块与第二框架一侧设置的连接块及其内部开设的矩形槽卡合连接,从而便于对第一框架与第二框架初步连接;通过设置的上盖板与下盖板便于对第一框架与第二框架的连接处进行密封,且通过下盖板两端开设的卡槽与上盖板两端设置的卡条卡合连接,从而使上盖板与下盖板初步卡合。
Aluminum alloy formwork installation structure
一种铝合金模板安装结构
LIAO FUXING (author) / ZHANG HENG (author) / NI YUANCHUN (author)
2020-07-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Foldable aluminum alloy formwork installation operation stool
European Patent Office | 2024
|Aluminum alloy formwork and installation process thereof
European Patent Office | 2024
|Connecting piece for rapid installation between aluminum alloy formwork and wood formwork
European Patent Office | 2024
|Deepening design and installation technology for aluminum alloy formwork
European Patent Office | 2021
|