Auxiliary installation method of inclinometer for monitoring deep horizontal displacement of deep foundation pit
The invention discloses an auxiliary installation method of an inclinometer for monitoring deep horizontal displacement of a deep foundation pit. A PVC sleeve (1), a drilling machine (2) provided witha mud pump (2-1), a rubber pipe (3) and the inclinometer (4) are included, the drilling machine (2) drills a hole in a soil slope in advance, the mud pump (2-1) is started in the drilling process, bentonite mud which is stirred in advance and has a specific concentration is pumped through the rubber pipe (3), and the mud protects the wall of the drilled hole through a hollow drill rod; when drilling is carried out to the designed elevation of the bottom of the hole, the PVC sleeve (1) is placed in the drilled hole section by section; the rubber pipe (3) at an inlet of the mud pump is insertedinto the bottom of the PVC sleeve (1) in the drilled hole, and the mud pump (2-1) is started to pump out the mud in the drilled hole; then the rubber pipe at the inlet of the mud pump is pulled out,and the inclinometer (4) is placed in the PVC sleeve (1) section by section; and then the PVC sleeve (1) is pulled out section by section, and finally fine sand is backfilled into the drilled hole forhole shrinkage.
本发明公开了一种深基坑深层水平位移监测用测斜管辅助安装方法,包括PVC套管(1)、配备泥浆泵(2‑1)的钻机(2)、橡胶管(3)和测斜管(4);钻机(2)预先在土坡上钻孔,钻孔过程中启动泥浆泵(2‑1),用橡胶管(3)抽取预先拌置好特定浓度的膨润土泥浆,泥浆通过空心钻杆对钻孔进行护壁;钻至孔底设计标高时,将PVC套管(1)逐段下放于钻孔;将泥浆泵进口的橡胶管(3)插入钻孔内的PVC套管(1)的底部,启动泥浆泵(2‑1)抽干钻孔内的泥浆;然后抽出泥浆泵进口的橡胶管,将测斜管(4)逐段下放于PVC套管(1)内;然后分段拔出PVC套管(1),最后往钻孔内回填细砂进行缩孔。
Auxiliary installation method of inclinometer for monitoring deep horizontal displacement of deep foundation pit
The invention discloses an auxiliary installation method of an inclinometer for monitoring deep horizontal displacement of a deep foundation pit. A PVC sleeve (1), a drilling machine (2) provided witha mud pump (2-1), a rubber pipe (3) and the inclinometer (4) are included, the drilling machine (2) drills a hole in a soil slope in advance, the mud pump (2-1) is started in the drilling process, bentonite mud which is stirred in advance and has a specific concentration is pumped through the rubber pipe (3), and the mud protects the wall of the drilled hole through a hollow drill rod; when drilling is carried out to the designed elevation of the bottom of the hole, the PVC sleeve (1) is placed in the drilled hole section by section; the rubber pipe (3) at an inlet of the mud pump is insertedinto the bottom of the PVC sleeve (1) in the drilled hole, and the mud pump (2-1) is started to pump out the mud in the drilled hole; then the rubber pipe at the inlet of the mud pump is pulled out,and the inclinometer (4) is placed in the PVC sleeve (1) section by section; and then the PVC sleeve (1) is pulled out section by section, and finally fine sand is backfilled into the drilled hole forhole shrinkage.
本发明公开了一种深基坑深层水平位移监测用测斜管辅助安装方法,包括PVC套管(1)、配备泥浆泵(2‑1)的钻机(2)、橡胶管(3)和测斜管(4);钻机(2)预先在土坡上钻孔,钻孔过程中启动泥浆泵(2‑1),用橡胶管(3)抽取预先拌置好特定浓度的膨润土泥浆,泥浆通过空心钻杆对钻孔进行护壁;钻至孔底设计标高时,将PVC套管(1)逐段下放于钻孔;将泥浆泵进口的橡胶管(3)插入钻孔内的PVC套管(1)的底部,启动泥浆泵(2‑1)抽干钻孔内的泥浆;然后抽出泥浆泵进口的橡胶管,将测斜管(4)逐段下放于PVC套管(1)内;然后分段拔出PVC套管(1),最后往钻孔内回填细砂进行缩孔。
Auxiliary installation method of inclinometer for monitoring deep horizontal displacement of deep foundation pit
一种深基坑深层水平位移监测用测斜管辅助安装方法
YUAN FANGLONG (author) / XU YITENG (author) / CHEN YUNTAO (author) / LI BIN (author) / LIU TIANYUN (author)
2020-07-24
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2024
|Determination method for deep horizontal displacement by taking inclinometer orifice as benchmark
European Patent Office | 2022
|Deep Foundation Pit Monitoring Based on CX-3C Inclinometer
Trans Tech Publications | 2014
|