A platform for research: civil engineering, architecture and urbanism
Method and structure for pouring concrete floor post-cast strip through inflatable formwork
The invention discloses a method and a structure for pouring a concrete floor post-cast strip through an inflatable formwork. According to the method, construction is carried out by the following steps of binding floor steel bars and reserving a post-cast strip range; positioning and fixing water stop plates by spot welding through fixing steel bars; mounting the inflatable formwork in a special customized shape; inflating the inflatable formwork; pouring floor concrete; and removing the formwork. The method is high in universality, capable of achieving various-size reasonable splicing, high in repeated utilization rate, green, environment-friendly and free of pollution; and after the post-cast strip range is filled, the post-cast strip is attractive and elegant, construction waste can beprevented from entering the post-cast strip, the construction waste is easy to clean in the later period, labor cost is saved, operation is easy and convenient, the construction period is short, and concrete forming quality is good.
本发明公开了一种采用充气模板浇筑混凝土楼板后浇带的方法及结构,本发明按以下步骤施工:绑扎好楼板钢筋并留出后浇带范围→用固定钢筋点焊定位并固定止水板→安装特殊定制形状的充气模板→对充气模板进行充气→浇筑楼板混凝土→拆除模板。本发明通用性强,各种尺寸可合理拼接,重复利用率高,绿色环保无污染。填充满后浇带范围后,美观大方,可阻止建筑垃圾进入后浇带内部,后期容易清理建筑垃圾,节约人工成本,操作简单方便,工期快,混凝土成型质量好。
Method and structure for pouring concrete floor post-cast strip through inflatable formwork
The invention discloses a method and a structure for pouring a concrete floor post-cast strip through an inflatable formwork. According to the method, construction is carried out by the following steps of binding floor steel bars and reserving a post-cast strip range; positioning and fixing water stop plates by spot welding through fixing steel bars; mounting the inflatable formwork in a special customized shape; inflating the inflatable formwork; pouring floor concrete; and removing the formwork. The method is high in universality, capable of achieving various-size reasonable splicing, high in repeated utilization rate, green, environment-friendly and free of pollution; and after the post-cast strip range is filled, the post-cast strip is attractive and elegant, construction waste can beprevented from entering the post-cast strip, the construction waste is easy to clean in the later period, labor cost is saved, operation is easy and convenient, the construction period is short, and concrete forming quality is good.
本发明公开了一种采用充气模板浇筑混凝土楼板后浇带的方法及结构,本发明按以下步骤施工:绑扎好楼板钢筋并留出后浇带范围→用固定钢筋点焊定位并固定止水板→安装特殊定制形状的充气模板→对充气模板进行充气→浇筑楼板混凝土→拆除模板。本发明通用性强,各种尺寸可合理拼接,重复利用率高,绿色环保无污染。填充满后浇带范围后,美观大方,可阻止建筑垃圾进入后浇带内部,后期容易清理建筑垃圾,节约人工成本,操作简单方便,工期快,混凝土成型质量好。
Method and structure for pouring concrete floor post-cast strip through inflatable formwork
一种采用充气模板浇筑混凝土楼板后浇带的方法及结构
ZHANG MING (author) / LIU LILI (author) / SONG WENBIN (author)
2020-07-24
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Method and structure for pouring concrete beam post-cast strip through inflatable formwork
European Patent Office | 2020
|European Patent Office | 2021
|Floor post-cast strip formwork erecting formwork structure
European Patent Office | 2023
|Post-cast strip formwork and construction method for pouring post-cast strip
European Patent Office | 2021
|Method and structure for pouring concrete column through inflatable formwork fixed to floor slab
European Patent Office | 2020
|