A platform for research: civil engineering, architecture and urbanism
Prefabricated shear wall component and construction method thereof
The invention relates to a prefabricated shear wall component and a construction method thereof. The prefabricated shear wall component comprises a wall body, a first grouting hole, a second groutinghole, a first grouting pipe, a second grouting pipe and a connecting piece; the wall body is provided with a first end and a second end which are oppositely arranged, the first grouting hole and the second grouting hole are both formed in the wall body, and the distance between the first grouting hole and the second end is smaller than the distance between the second grouting hole and the second end; the first grouting pipe and the second grouting pipe are both located in the wall body, the first grouting pipe communicates with the first grouting hole and the second end, the second grouting pipe communicates with the second grouting hole and the second end, and the extending direction of the first grouting pipe and the extending direction of the second grouting pipe are both parallel to the connecting line between the first end and the second end; and the connecting piece is embedded in the wall body and extends out of the wall body from the second end. The prefabricated shear wall component is high in assembly rate, easy to construct, and capable of greatly shortening the construction period and improving the construction efficiency; and in addition, the construction method of theprefabricated shear wall component is simple in steps, flexible in construction and suitable for being applied and popularized.
本发明涉及一种预制装配式剪力墙构件及其施工方法。所述预制装配式剪力墙构件包括墙本体、第一注浆孔、第二注浆孔、第一注浆管、第二注浆管和连接件。墙本体包括相对设置的第一端和第二端,第一注浆孔和第二注浆孔均开设于墙本体,第一注浆孔与第二端之间的距离小于第二注浆孔与第二端之间的距离。第一注浆管和第二注浆管均位于墙本体内,第一注浆管与第一注浆孔和第二端连通,第二注浆管与第二注浆孔和第二端连通,第一注浆管和第二注浆管的延伸方向均平行于第一端与第二端之间的连线。连接件预埋于墙本体内并自第二端伸出墙本体外。上述预制装配式剪力墙构件装配率高、施工简单,能够极大地缩短施工周期,提高施工效率。此外,上述预制装配式剪力墙构件的施工方法步骤简单、施工灵活,适于推广应用。
Prefabricated shear wall component and construction method thereof
The invention relates to a prefabricated shear wall component and a construction method thereof. The prefabricated shear wall component comprises a wall body, a first grouting hole, a second groutinghole, a first grouting pipe, a second grouting pipe and a connecting piece; the wall body is provided with a first end and a second end which are oppositely arranged, the first grouting hole and the second grouting hole are both formed in the wall body, and the distance between the first grouting hole and the second end is smaller than the distance between the second grouting hole and the second end; the first grouting pipe and the second grouting pipe are both located in the wall body, the first grouting pipe communicates with the first grouting hole and the second end, the second grouting pipe communicates with the second grouting hole and the second end, and the extending direction of the first grouting pipe and the extending direction of the second grouting pipe are both parallel to the connecting line between the first end and the second end; and the connecting piece is embedded in the wall body and extends out of the wall body from the second end. The prefabricated shear wall component is high in assembly rate, easy to construct, and capable of greatly shortening the construction period and improving the construction efficiency; and in addition, the construction method of theprefabricated shear wall component is simple in steps, flexible in construction and suitable for being applied and popularized.
本发明涉及一种预制装配式剪力墙构件及其施工方法。所述预制装配式剪力墙构件包括墙本体、第一注浆孔、第二注浆孔、第一注浆管、第二注浆管和连接件。墙本体包括相对设置的第一端和第二端,第一注浆孔和第二注浆孔均开设于墙本体,第一注浆孔与第二端之间的距离小于第二注浆孔与第二端之间的距离。第一注浆管和第二注浆管均位于墙本体内,第一注浆管与第一注浆孔和第二端连通,第二注浆管与第二注浆孔和第二端连通,第一注浆管和第二注浆管的延伸方向均平行于第一端与第二端之间的连线。连接件预埋于墙本体内并自第二端伸出墙本体外。上述预制装配式剪力墙构件装配率高、施工简单,能够极大地缩短施工周期,提高施工效率。此外,上述预制装配式剪力墙构件的施工方法步骤简单、施工灵活,适于推广应用。
Prefabricated shear wall component and construction method thereof
预制装配式剪力墙构件及其施工方法
LONG LIBO (author) / ZHENG QIZHEN (author) / MA YUEQIANG (author) / WANG ZHUJUN (author) / CHEN GANG (author)
2020-07-28
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabricated shear wall component and construction method thereof
European Patent Office | 2023
|Prefabricated wall component and construction method thereof
European Patent Office | 2024
|Prefabricated shear wall system and construction method thereof
European Patent Office | 2023
|Prefabricated shear wall system and construction method thereof
European Patent Office | 2023
|Prefabricated shear wall system and construction method thereof
European Patent Office | 2024
|