A platform for research: civil engineering, architecture and urbanism
Cable bent tower operating platform formwork separating and lifting system
The invention provides a cable bent tower operation platform formwork separating and lifting system. The cable bent tower operation platform formwork separating and lifting system comprises a formworksystem, a supporting system and a protection system. The formwork system comprises an inner formwork and an outer formwork, and the inner formwork and the outer formwork are fixedly connected throughopposite-pull screws. The supporting system comprises an enclosure, a lifting frame and a supporting rod, the supporting rod is fixedly arranged in the concrete, the lifting frame is fixedly arrangedon the enclosure, the enclosure is arranged on the outer side of the outer mold in a sleeving mode, a center hole jack is arranged on the lifting frame, the center hole jack is in transmission connection to the supporting rod, and the outer mold is hung on the lifting frame; the protection system comprises an operation table and guardrails, the operation table is hung below the enclosure, and theguardrails are fixedly arranged on the periphery of the operation table. The center hole jack climbs upwards along the supporting rod, the whole supporting system can be driven to climb as a whole, the next section of steel bar construction procedure is conducted, and the whole construction process is continuous. Construction is conducted in the form the same as that of a creeping formwork in a formwork assembling mode, the advantages of a sliding and overturning combined integrated process are achieved, and the appearance quality the same as that of a turnover formwork can be achieved whileit is guaranteed that the construction speed is equal to that of the sliding formwork.
本申请提供了一种索塔操作平台模板分离提升系统,包括模板系统、支撑系统和防护系统。其中,模板系统包括内模和外模,内模和外模通过对拉螺杆固定连接;支撑系统包括围圈、提升架和支撑杆,支撑杆固设于混凝土内,提升架固设于围圈上,围圈套设与外模外侧,提升架上设有穿心千斤顶,穿心千斤顶传动连接在支撑杆上,外模挂设于所述提升架上;防护系统包括操作台和护栏,操作台挂设与围圈的下方,护栏固设于操作台的四周。通过穿心千斤顶沿支撑杆向上爬升,可以带动整个支撑系统整体爬升,并进行下一节段钢筋施工工序,整套施工流程连续不间断;以合模方式与爬模相同的形式进行施工,具备滑翻结合一体化工艺的优点,既能在保证施工速度与滑模相当的同时做到与翻模一样的外观质量。
Cable bent tower operating platform formwork separating and lifting system
The invention provides a cable bent tower operation platform formwork separating and lifting system. The cable bent tower operation platform formwork separating and lifting system comprises a formworksystem, a supporting system and a protection system. The formwork system comprises an inner formwork and an outer formwork, and the inner formwork and the outer formwork are fixedly connected throughopposite-pull screws. The supporting system comprises an enclosure, a lifting frame and a supporting rod, the supporting rod is fixedly arranged in the concrete, the lifting frame is fixedly arrangedon the enclosure, the enclosure is arranged on the outer side of the outer mold in a sleeving mode, a center hole jack is arranged on the lifting frame, the center hole jack is in transmission connection to the supporting rod, and the outer mold is hung on the lifting frame; the protection system comprises an operation table and guardrails, the operation table is hung below the enclosure, and theguardrails are fixedly arranged on the periphery of the operation table. The center hole jack climbs upwards along the supporting rod, the whole supporting system can be driven to climb as a whole, the next section of steel bar construction procedure is conducted, and the whole construction process is continuous. Construction is conducted in the form the same as that of a creeping formwork in a formwork assembling mode, the advantages of a sliding and overturning combined integrated process are achieved, and the appearance quality the same as that of a turnover formwork can be achieved whileit is guaranteed that the construction speed is equal to that of the sliding formwork.
本申请提供了一种索塔操作平台模板分离提升系统,包括模板系统、支撑系统和防护系统。其中,模板系统包括内模和外模,内模和外模通过对拉螺杆固定连接;支撑系统包括围圈、提升架和支撑杆,支撑杆固设于混凝土内,提升架固设于围圈上,围圈套设与外模外侧,提升架上设有穿心千斤顶,穿心千斤顶传动连接在支撑杆上,外模挂设于所述提升架上;防护系统包括操作台和护栏,操作台挂设与围圈的下方,护栏固设于操作台的四周。通过穿心千斤顶沿支撑杆向上爬升,可以带动整个支撑系统整体爬升,并进行下一节段钢筋施工工序,整套施工流程连续不间断;以合模方式与爬模相同的形式进行施工,具备滑翻结合一体化工艺的优点,既能在保证施工速度与滑模相当的同时做到与翻模一样的外观质量。
Cable bent tower operating platform formwork separating and lifting system
一种索塔操作平台模板分离提升系统
LI XICHUN (author) / YANG TIANWEI (author) / XIAO GUANGSHENG (author) / HE RUN (author) / TANG LIQIANG (author) / LIU YANG (author) / XU SUOJUN (author) / CAI WEIMIN (author) / GONG SHAN (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
/
B66D
Haspeln
,
CAPSTANS
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Automatic creeping formwork mechanism for cable bent tower and construction method
European Patent Office | 2024
|Manufacturing and construction process of vase-shaped cable bent tower steel formwork
European Patent Office | 2020
|European Patent Office | 2024
|Multifunctional intelligent climbing platform for combined cable bent tower
European Patent Office | 2023
|