A platform for research: civil engineering, architecture and urbanism
Double-layer turbulent flow type snow blocking wall
The invention discloses a double-layer turbulent flow type snow blocking wall. The wall comprises two stand columns arranged side by side. A first snow blocking net, a first spoiler, a second snow blocking net, a second spoiler and a third snow blocking net are sequentially arranged between the two stand columns from top to bottom. Gaps are formed between the first spoiler and the first snow blocking net and between the first spoiler and the second snow blocking net, gaps are formed between the second spoiler and the second snow blocking net and between the second spoiler and the third snow blocking net, when the snow blocking device is used, the third snow blocking net is adjacent to the ground, and gaps are formed between the third snow blocking net and the ground. The snow blocking wallis high in snow blocking efficiency, long in service life, capable of reducing maintenance cost, wide in application range, capable of adapting to various complex working conditions and capable of meeting the snow prevention requirement of engineering construction.
本发明公开了一种双层扰流式挡雪墙,包括并排设置的两根立柱,沿从上往下的顺序、两根立柱之间依次设置有第一阻雪网、第一扰流器、第二阻雪网、第二扰流器和第三阻雪网,第一扰流器与第一阻雪网和第二阻雪网之间均有间隙,第二扰流器与第二阻雪网和第三阻雪网之间均有间隙,使用时,第三阻雪网与地面相邻,且第三阻雪网与地面之间有空隙。该挡雪墙阻雪效率高和使用寿命长,能够减少养护成本,适用范围广,可适多种复杂的工况条件,满足工程建设的防雪需求。
Double-layer turbulent flow type snow blocking wall
The invention discloses a double-layer turbulent flow type snow blocking wall. The wall comprises two stand columns arranged side by side. A first snow blocking net, a first spoiler, a second snow blocking net, a second spoiler and a third snow blocking net are sequentially arranged between the two stand columns from top to bottom. Gaps are formed between the first spoiler and the first snow blocking net and between the first spoiler and the second snow blocking net, gaps are formed between the second spoiler and the second snow blocking net and between the second spoiler and the third snow blocking net, when the snow blocking device is used, the third snow blocking net is adjacent to the ground, and gaps are formed between the third snow blocking net and the ground. The snow blocking wallis high in snow blocking efficiency, long in service life, capable of reducing maintenance cost, wide in application range, capable of adapting to various complex working conditions and capable of meeting the snow prevention requirement of engineering construction.
本发明公开了一种双层扰流式挡雪墙,包括并排设置的两根立柱,沿从上往下的顺序、两根立柱之间依次设置有第一阻雪网、第一扰流器、第二阻雪网、第二扰流器和第三阻雪网,第一扰流器与第一阻雪网和第二阻雪网之间均有间隙,第二扰流器与第二阻雪网和第三阻雪网之间均有间隙,使用时,第三阻雪网与地面相邻,且第三阻雪网与地面之间有空隙。该挡雪墙阻雪效率高和使用寿命长,能够减少养护成本,适用范围广,可适多种复杂的工况条件,满足工程建设的防雪需求。
Double-layer turbulent flow type snow blocking wall
双层扰流式挡雪墙
CUI YONG (author) / GUAN DA (author) / LIU XIU (author) / LI ZHOU (author) / XUE CHUNXIAO (author) / KONG LINGWEI (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Turbulent flow type snow melting and blocking wall device
European Patent Office | 2020
|European Patent Office | 2020
|Snow blocking device assembly and material shed roof snow blocking system
European Patent Office | 2023
|