A platform for research: civil engineering, architecture and urbanism
Steel structure beam-column connection method for prefabricated buildings
The invention discloses a steel structure beam-column connection method for prefabricated buildings, and relates to the field of prefabricated buildings. When installing the invention, a pillar connecting part in a first connecting steel piece is first fixedly connected to an internal thread cylinder holder pre-embedded in the pillar through screws, and then a second connecting steel piece connected at one end of a beam is connected to the first connecting steel piece. During the process of connection, a second clamping plate in the second connecting steel piece and a first clamping plate on the first connecting steel piece are interlocked and inserted into each other in a staggered manner and finally penetrate through bolt holes of the first clamping plate and the second clamping plate through bolts, and the ends of the bolts are fixedly connected by nuts, which is convenient for installation.
本发明公开了一种用于装配式建筑的钢结构梁柱连接方法,涉及到装配式建筑领域,本发明进行安装时,先通过螺钉将第一连接钢件中的支柱连接部与支柱内部预埋的内丝筒座进行固定连接,再将横梁一端所连接的第二连接钢件与第一连接钢件进行连接,连接过程中,使第二连接钢件中第二卡板与第一连接钢件上的第一卡板相互交错卡嵌,最后通过螺栓贯穿第一卡板、第二卡板所开设的螺栓孔,螺栓端部由螺母进行固定连接,安装方便。
Steel structure beam-column connection method for prefabricated buildings
The invention discloses a steel structure beam-column connection method for prefabricated buildings, and relates to the field of prefabricated buildings. When installing the invention, a pillar connecting part in a first connecting steel piece is first fixedly connected to an internal thread cylinder holder pre-embedded in the pillar through screws, and then a second connecting steel piece connected at one end of a beam is connected to the first connecting steel piece. During the process of connection, a second clamping plate in the second connecting steel piece and a first clamping plate on the first connecting steel piece are interlocked and inserted into each other in a staggered manner and finally penetrate through bolt holes of the first clamping plate and the second clamping plate through bolts, and the ends of the bolts are fixedly connected by nuts, which is convenient for installation.
本发明公开了一种用于装配式建筑的钢结构梁柱连接方法,涉及到装配式建筑领域,本发明进行安装时,先通过螺钉将第一连接钢件中的支柱连接部与支柱内部预埋的内丝筒座进行固定连接,再将横梁一端所连接的第二连接钢件与第一连接钢件进行连接,连接过程中,使第二连接钢件中第二卡板与第一连接钢件上的第一卡板相互交错卡嵌,最后通过螺栓贯穿第一卡板、第二卡板所开设的螺栓孔,螺栓端部由螺母进行固定连接,安装方便。
Steel structure beam-column connection method for prefabricated buildings
一种用于装配式建筑的钢结构梁柱连接方法
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2015
|European Patent Office | 2024
|Prefabricated building beam-column joint connection structure
European Patent Office | 2020
|Beam-to-column connection structure of prefabricated light steel structure building
European Patent Office | 2020
|Prefabricated composite column and beam-column connection joint structure
European Patent Office | 2024
|