Installation method and structure of rail-top air duct
The invention provides an installation method and structure of a rail-top air duct. The method includes the steps that S0, air duct side plates and air duct bottom plates are prefabricated, wherein pouring grooves are formed in the tops of the air duct side plates; S1, the air duct side plates are lifted and positioned on site, so that the pouring grooves in the air duct side plates communicate with pouring holes reserved in station middle plates; S2, cast-in-situ concrete enters the pouring grooves in the air duct side plates through the pouring holes in the station middle plates, so that theair duct side plates and the station middle plates are fixedly bonded; and S3, the air duct bottom plates are mounted between structural side walls and the air duct side plates. The air duct side plates and the station middle plates are fixedly bonded into a whole through the cast-in-site concrete so as to bear force cooperatively, and thus the stability and reliability of the installation structure of the rail-top air duct can be remarkably improved; and no scaffold or formwork needs to be erected, construction is convenient, the construction speed is high, efficiency is high, and the construction time and costs are effectively saved.
本发明提供一种轨顶风道的安装方法和安装结构,方法包括:S0,进行风道侧板和风道底板的预制,风道侧板的顶部设有浇筑槽;S1,现场进行风道侧板的上升和定位,使风道侧板的浇筑槽与车站中板上预留的浇筑孔连通;S2,通过车站中板上的浇筑孔使现浇混凝土进入风道侧板的浇筑槽内,使该风道侧板与车站中板固结在一起;S3,将风道底板安装至结构侧墙与风道侧板之间。本发明通过现浇混凝土将风道侧板与车站中板固结为一体,使二者协同受力,能显著地提高轨顶风道安装结构的稳定性和可靠性;无需搭设脚手架、模板等,施工便利,施工速度快、效率高,有效地节约施工时间和成本。
Installation method and structure of rail-top air duct
The invention provides an installation method and structure of a rail-top air duct. The method includes the steps that S0, air duct side plates and air duct bottom plates are prefabricated, wherein pouring grooves are formed in the tops of the air duct side plates; S1, the air duct side plates are lifted and positioned on site, so that the pouring grooves in the air duct side plates communicate with pouring holes reserved in station middle plates; S2, cast-in-situ concrete enters the pouring grooves in the air duct side plates through the pouring holes in the station middle plates, so that theair duct side plates and the station middle plates are fixedly bonded; and S3, the air duct bottom plates are mounted between structural side walls and the air duct side plates. The air duct side plates and the station middle plates are fixedly bonded into a whole through the cast-in-site concrete so as to bear force cooperatively, and thus the stability and reliability of the installation structure of the rail-top air duct can be remarkably improved; and no scaffold or formwork needs to be erected, construction is convenient, the construction speed is high, efficiency is high, and the construction time and costs are effectively saved.
本发明提供一种轨顶风道的安装方法和安装结构,方法包括:S0,进行风道侧板和风道底板的预制,风道侧板的顶部设有浇筑槽;S1,现场进行风道侧板的上升和定位,使风道侧板的浇筑槽与车站中板上预留的浇筑孔连通;S2,通过车站中板上的浇筑孔使现浇混凝土进入风道侧板的浇筑槽内,使该风道侧板与车站中板固结在一起;S3,将风道底板安装至结构侧墙与风道侧板之间。本发明通过现浇混凝土将风道侧板与车站中板固结为一体,使二者协同受力,能显著地提高轨顶风道安装结构的稳定性和可靠性;无需搭设脚手架、模板等,施工便利,施工速度快、效率高,有效地节约施工时间和成本。
Installation method and structure of rail-top air duct
轨顶风道的安装方法及安装结构
DU XIN (author) / XU JUNLIN (author) / LI YANG (author) / ZHU DAN (author) / XIONG CHAOHUI (author) / WANG HUABING (author) / ZHANG FENG (author) / ZHOU BING (author) / YU XING (author) / FU XIANJIN (author)
2020-08-14
Patent
Electronic Resource
Chinese
Installation method of underground station rail top air duct prefabricated structure
European Patent Office | 2021
|European Patent Office | 2016
|