A platform for research: civil engineering, architecture and urbanism
Concrete cast-in-place box girder appearance modification equipment
The invention provides concrete cast-in-place box beam appearance modification equipment which comprises a main beam, a carrying device used for carrying the main beam, a first connecting part detachably connected to the left side of the main beam and a second connecting part detachably connected to the right side of the main beam, and a containing cavity for containing a concrete cast-in-place box beam is defined by the main beam, the first connecting part and the second connecting part. A maneuvering carrier loader is detachably connected to the lower portion of the main beam, and thereforethe main beam can be moved conveniently in the construction process. The first connecting part and the second connecting part are detachably connected to the left side and the right side of the main beam, so that the two sides of the bridge are convenient to construct, and meanwhile, the safety during construction is also improved. And when construction is finished, the first connecting part and the second connecting part can be detached, and transportation and storage are facilitated.
本发明提供了一种混凝土现浇箱梁外观修饰设备,包括主梁、用于运载主梁的运载装置、可拆卸的连接在主梁左侧的第一连接部、可拆卸的连接在主梁右侧的第二连接部,主梁、第一连接部和第二连接部合围成容纳混凝土现浇箱梁的容纳腔。在主梁的下方可拆卸的连接有机动运载车,方便在施工过程中主梁的移动。通过在主梁的左右两侧可拆卸的连接有第一连接部和第二连接部,便于对桥梁两侧进行施工,同时也提高了施工时的安全性。在施工结束时可以将第一连接部和第二连接部拆卸下来,便于运输和收纳。
Concrete cast-in-place box girder appearance modification equipment
The invention provides concrete cast-in-place box beam appearance modification equipment which comprises a main beam, a carrying device used for carrying the main beam, a first connecting part detachably connected to the left side of the main beam and a second connecting part detachably connected to the right side of the main beam, and a containing cavity for containing a concrete cast-in-place box beam is defined by the main beam, the first connecting part and the second connecting part. A maneuvering carrier loader is detachably connected to the lower portion of the main beam, and thereforethe main beam can be moved conveniently in the construction process. The first connecting part and the second connecting part are detachably connected to the left side and the right side of the main beam, so that the two sides of the bridge are convenient to construct, and meanwhile, the safety during construction is also improved. And when construction is finished, the first connecting part and the second connecting part can be detached, and transportation and storage are facilitated.
本发明提供了一种混凝土现浇箱梁外观修饰设备,包括主梁、用于运载主梁的运载装置、可拆卸的连接在主梁左侧的第一连接部、可拆卸的连接在主梁右侧的第二连接部,主梁、第一连接部和第二连接部合围成容纳混凝土现浇箱梁的容纳腔。在主梁的下方可拆卸的连接有机动运载车,方便在施工过程中主梁的移动。通过在主梁的左右两侧可拆卸的连接有第一连接部和第二连接部,便于对桥梁两侧进行施工,同时也提高了施工时的安全性。在施工结束时可以将第一连接部和第二连接部拆卸下来,便于运输和收纳。
Concrete cast-in-place box girder appearance modification equipment
一种混凝土现浇箱梁外观修饰设备
LI GUANGQUAN (author) / MA NIAN (author) / WANG MENGWEI (author) / WANG GUOFENG (author) / LIAO ZHENGJIE (author)
2020-08-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Prestressed concrete box girder cast-in-place and girder falling construction method
European Patent Office | 2023
|Cast-in-place box girder support system and cast-in-place box girder construction method
European Patent Office | 2024
|Combined movable template for cast-in-place concrete box girder
European Patent Office | 2023
|Concrete pouring construction method of cast-in-place box girder
European Patent Office | 2020
|Cast-in-place concrete box girder manhole cover plate system
European Patent Office | 2024
|