Prefabricated concrete shear wall house building structure and construction method thereof
The invention discloses a prefabricated concrete shear wall house building structure. The prefabricated concrete shear wall house building structure comprises a base made of reinforced concrete, two shear walls and a top beam, wherein the base is buried underground; the lower ends of the two shear walls abut against the two sides of the upper end face of the base; the shear walls are perpendicularto the base; the upper ends of the two shear walls abut against the two ends of the top beam correspondingly; a device facilitating construction and installation is arranged at the joint of the baseand the shear walls; and a damping and reinforcing device is arranged at the joint of the top beam and the shear walls. The prefabricated concrete shear wall house building structure has the advantages that the pre-poured base, the shear walls and the top beam are matched to be installed through a crane, on one hand, manpower and material resources consumed by construction are reduced, on the other hand, due to the fact that the pre-poured shear walls are not positioned on a construction site, cement blending is convenient, the construction difficulty is low, the pouring time is short, and therefore the pouring quality can be guaranteed; and meanwhile, prefabrication of reinforced concrete can be conducted during foundation construction, and the overall construction time is greatly shortened.
本发明公开了一种预制混凝土剪力墙房建筑结构,包括由钢筋混凝土制成底座、两块剪力墙和顶梁,所述底座埋设在地下,两块所述剪力墙的下端与底座上端面的两侧位置相抵,所述剪力墙与底座相互垂直,两块所述剪力墙的上端分别与顶梁的两端相抵,所述底座与剪力墙连接处共同设有便施工安装装置,所述顶梁与剪力墙连接处设有减震加固装置。优点在于:本发明通过吊车将预先浇筑底座、剪力墙和顶梁相互配合进行安装,一方面减少施工所消耗的人力物力,另一方面预先浇筑的剪力墙因不在施工现场,水泥调配方便,使得施工难度小,浇筑时间快,从而可保证浇筑的质量,且可在地基建设时同时进行钢筋混凝土的预制,大大缩短了整体的施工时间。
Prefabricated concrete shear wall house building structure and construction method thereof
The invention discloses a prefabricated concrete shear wall house building structure. The prefabricated concrete shear wall house building structure comprises a base made of reinforced concrete, two shear walls and a top beam, wherein the base is buried underground; the lower ends of the two shear walls abut against the two sides of the upper end face of the base; the shear walls are perpendicularto the base; the upper ends of the two shear walls abut against the two ends of the top beam correspondingly; a device facilitating construction and installation is arranged at the joint of the baseand the shear walls; and a damping and reinforcing device is arranged at the joint of the top beam and the shear walls. The prefabricated concrete shear wall house building structure has the advantages that the pre-poured base, the shear walls and the top beam are matched to be installed through a crane, on one hand, manpower and material resources consumed by construction are reduced, on the other hand, due to the fact that the pre-poured shear walls are not positioned on a construction site, cement blending is convenient, the construction difficulty is low, the pouring time is short, and therefore the pouring quality can be guaranteed; and meanwhile, prefabrication of reinforced concrete can be conducted during foundation construction, and the overall construction time is greatly shortened.
本发明公开了一种预制混凝土剪力墙房建筑结构,包括由钢筋混凝土制成底座、两块剪力墙和顶梁,所述底座埋设在地下,两块所述剪力墙的下端与底座上端面的两侧位置相抵,所述剪力墙与底座相互垂直,两块所述剪力墙的上端分别与顶梁的两端相抵,所述底座与剪力墙连接处共同设有便施工安装装置,所述顶梁与剪力墙连接处设有减震加固装置。优点在于:本发明通过吊车将预先浇筑底座、剪力墙和顶梁相互配合进行安装,一方面减少施工所消耗的人力物力,另一方面预先浇筑的剪力墙因不在施工现场,水泥调配方便,使得施工难度小,浇筑时间快,从而可保证浇筑的质量,且可在地基建设时同时进行钢筋混凝土的预制,大大缩短了整体的施工时间。
Prefabricated concrete shear wall house building structure and construction method thereof
一种预制混凝土剪力墙房建筑结构及其施工方法
ZHANG GUOHUA (author)
2020-08-21
Patent
Electronic Resource
Chinese
Prefabricated concrete shear wall structure and construction method thereof
European Patent Office | 2022
|European Patent Office | 2020
|Full-prefabricated concrete shear wall and construction method thereof
European Patent Office | 2021
|Prestressed prefabricated concrete shear wall system and construction method thereof
European Patent Office | 2020
|