A platform for research: civil engineering, architecture and urbanism
Prefabricated building shear wall structure
The invention discloses a prefabricated building shear wall structure, and relates to the field of constructional engineering structures. The prefabricated building shear wall structure comprises twosurface plates, wherein the two surface plates are arranged, and the two surface plates are parallel to each other and are arranged in a central symmetry mode on the front side and the rear side. According to the prefabricated building shear wall structure, the two surface plates are matched with connecting arms to form a parallelogram structure, so that space occupation is reduced, and storage and long-distance transportation are facilitated; threaded locking rods are sleeved with the inner sides of positioning holes in a penetrating mode to form a frame structure of a shear wall, so that splicing operation is facilitated, modular assembly and construction operation can be effectively facilitated, and the operation efficiency is improved; and first horizontal resistance rods are sleeved with longitudinal pipe bases in a penetrating mode, and a second horizontal resistance rod is sleeved with transverse pipe bases and lantern rings in a penetrating mode, so that rapid construction of ashear wall framework is achieved, the stress sharing effect is better, the strength is higher, maintenance is convenient, and the problems that assembling and transporting are inconvenient and modular building operation is inconvenient due to the fact that existing shear wall assembling materials are scattered are solved.
本发明公开了一种装配式建筑剪力墙结构,包括平面板,所述平面板的数目为两块,两块平面板相互平行且成前后侧中心对称设置。本发明涉及建筑工程结构领域。该装配式建筑剪力墙结构通过两块平面板配合连接臂构成平行四边形结构,减小了空间占用,便于储放和长途运输,通过向定位孔内侧穿套螺纹锁定杆构成剪力墙的框架结构,便于拼接操作,能够有效的提升模块化拼装和建设作业,提升作业效率,通过在纵向管座内穿套第一水平抗力杆,在横向管座和套环内穿套第二水平抗力杆实现了剪力墙骨架的快速构建,受力分摊效果更好,强度更高,且便于维护。这解决了现有剪力墙装配材料分散,不便与装配运输,也不便于模块化建筑作业的问题。
Prefabricated building shear wall structure
The invention discloses a prefabricated building shear wall structure, and relates to the field of constructional engineering structures. The prefabricated building shear wall structure comprises twosurface plates, wherein the two surface plates are arranged, and the two surface plates are parallel to each other and are arranged in a central symmetry mode on the front side and the rear side. According to the prefabricated building shear wall structure, the two surface plates are matched with connecting arms to form a parallelogram structure, so that space occupation is reduced, and storage and long-distance transportation are facilitated; threaded locking rods are sleeved with the inner sides of positioning holes in a penetrating mode to form a frame structure of a shear wall, so that splicing operation is facilitated, modular assembly and construction operation can be effectively facilitated, and the operation efficiency is improved; and first horizontal resistance rods are sleeved with longitudinal pipe bases in a penetrating mode, and a second horizontal resistance rod is sleeved with transverse pipe bases and lantern rings in a penetrating mode, so that rapid construction of ashear wall framework is achieved, the stress sharing effect is better, the strength is higher, maintenance is convenient, and the problems that assembling and transporting are inconvenient and modular building operation is inconvenient due to the fact that existing shear wall assembling materials are scattered are solved.
本发明公开了一种装配式建筑剪力墙结构,包括平面板,所述平面板的数目为两块,两块平面板相互平行且成前后侧中心对称设置。本发明涉及建筑工程结构领域。该装配式建筑剪力墙结构通过两块平面板配合连接臂构成平行四边形结构,减小了空间占用,便于储放和长途运输,通过向定位孔内侧穿套螺纹锁定杆构成剪力墙的框架结构,便于拼接操作,能够有效的提升模块化拼装和建设作业,提升作业效率,通过在纵向管座内穿套第一水平抗力杆,在横向管座和套环内穿套第二水平抗力杆实现了剪力墙骨架的快速构建,受力分摊效果更好,强度更高,且便于维护。这解决了现有剪力墙装配材料分散,不便与装配运输,也不便于模块化建筑作业的问题。
Prefabricated building shear wall structure
一种装配式建筑剪力墙结构
DOU HONGBIAO (author) / ZHANG ZENGRONG (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2025
|Prefabricated shear wall connecting structure for fabricated building
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2020
|