A platform for research: civil engineering, architecture and urbanism
Flood prevention gate for water conservancy project
The invention discloses a flood prevention gate for a water conservancy project. The flood prevention gate comprises piers, a base is arranged between the piers, a filter gate body is arranged at thetop of the base, a buffer gate body is arranged on the side face of the filter gate body, a first flood prevention gate body is arranged on one side of the buffer gate body, a second flood preventiongate body is arranged on one side of the first flood prevention gate body, connecting ropes are fixedly arranged at the tops of the buffer gate body, the first flood prevention gate body and the second flood prevention gate body, an infrared distance measuring instrument is arranged on the side faces of the connecting ropes, and a platform is arranged at the tops of the piers. According to the flood prevention gate, the filter gate body and the buffer gate body are arranged, and filtering holes in the filter gate body can effectively remove impurities in water, so that the situation that the flood prevention gate is damaged due to the fact that water flow carries the impurities and the impurities impact the first flood prevention gate body or the second flood prevention gate body is avoided; and impact force of the water flow can be effectively relieved when the water flow passes through buffer holes in the buffer gate body, and therefore the service lives of the first flood preventiongate body and the second flood prevention gate body are prolonged.
本发明公开了一种水利工程防汛闸门,包括桥墩,所述桥墩之间设有底座,所述底座顶部设有过滤闸门,所述过滤闸门侧面设有缓冲闸门,所述缓冲闸门一侧设有第一防汛闸门,所述第一防汛闸门一侧设有第二防汛闸门,所述缓冲闸门、第一防汛闸门和第二防汛闸门顶部均固定设有连接绳,所述连接绳侧面设有红外测距仪,所述桥墩顶部设有平台,本发明通过设有过滤闸门与缓冲闸门,过滤闸门上的滤孔可以有效去除水中杂物,避免水流携带杂物撞击在第一防汛闸门或第二防汛闸门上,从而对防汛闸门产生损害,当水流经过缓冲闸门上的缓冲孔时可以有效减缓水流的冲击力,从而增加第一防汛闸门与第二防汛闸门的使用寿命。
Flood prevention gate for water conservancy project
The invention discloses a flood prevention gate for a water conservancy project. The flood prevention gate comprises piers, a base is arranged between the piers, a filter gate body is arranged at thetop of the base, a buffer gate body is arranged on the side face of the filter gate body, a first flood prevention gate body is arranged on one side of the buffer gate body, a second flood preventiongate body is arranged on one side of the first flood prevention gate body, connecting ropes are fixedly arranged at the tops of the buffer gate body, the first flood prevention gate body and the second flood prevention gate body, an infrared distance measuring instrument is arranged on the side faces of the connecting ropes, and a platform is arranged at the tops of the piers. According to the flood prevention gate, the filter gate body and the buffer gate body are arranged, and filtering holes in the filter gate body can effectively remove impurities in water, so that the situation that the flood prevention gate is damaged due to the fact that water flow carries the impurities and the impurities impact the first flood prevention gate body or the second flood prevention gate body is avoided; and impact force of the water flow can be effectively relieved when the water flow passes through buffer holes in the buffer gate body, and therefore the service lives of the first flood preventiongate body and the second flood prevention gate body are prolonged.
本发明公开了一种水利工程防汛闸门,包括桥墩,所述桥墩之间设有底座,所述底座顶部设有过滤闸门,所述过滤闸门侧面设有缓冲闸门,所述缓冲闸门一侧设有第一防汛闸门,所述第一防汛闸门一侧设有第二防汛闸门,所述缓冲闸门、第一防汛闸门和第二防汛闸门顶部均固定设有连接绳,所述连接绳侧面设有红外测距仪,所述桥墩顶部设有平台,本发明通过设有过滤闸门与缓冲闸门,过滤闸门上的滤孔可以有效去除水中杂物,避免水流携带杂物撞击在第一防汛闸门或第二防汛闸门上,从而对防汛闸门产生损害,当水流经过缓冲闸门上的缓冲孔时可以有效减缓水流的冲击力,从而增加第一防汛闸门与第二防汛闸门的使用寿命。
Flood prevention gate for water conservancy project
一种水利工程防汛闸门
MIN ZHIHUA (author) / DU YUFEI (author) / SHUAI BINKUN (author) / XIE QIAN (author) / HE WENJIAN (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau