A platform for research: civil engineering, architecture and urbanism
Flood prevention gate for water conservancy project
The flood prevention gate for the water conservancy project comprises a gate body and two connecting pipes, mounting holes are formed in the two sides of the gate body, the connecting pipes correspond to the mounting holes in a one-to-one mode, one ends of the connecting pipes are inserted into the mounting holes, the other ends of the connecting pipes are located outside the gate body, and the connecting pipes are connected with the inner walls of the mounting holes in a sealed mode. A lifting device is arranged in the brake body, an executing mechanism and a cleaning mechanism are arranged in the brake body, the executing mechanism and the cleaning mechanism are both located above the connecting pipe, and the executing mechanism comprises a guide pipe, a lifting disc, a lifting pipe, a connecting block, two limiting blocks and two executing assemblies; according to the flood prevention gate for the water conservancy project, the opening and closing function is achieved through the executing mechanism, in addition, the function of removing impurities on the inner wall of the gate body is achieved through the cleaning mechanism, and the impurities are prevented from affecting the sealing performance between the sealing disc and the inner wall of the gate body.
本发明涉及一种水利工程用防汛闸门,包括闸体和两个连接管,所述闸体的两侧均设有安装孔,所述连接管与安装孔一一对应,所述连接管的一端插入安装孔,所述连接管的另一端位于闸体的外部,所述连接管与安装孔的内壁密封连接,所述闸体内设有升降装置,所述闸体内设有执行机构和清洁机构,所述执行机构和清洁机构均位于连接管的上方,所述执行机构包括导管、升降盘、升降管、连接块、两个限位块和两个执行组件,该水利工程用防汛闸门通过执行机构实现了启闭的功能,不仅如此,还通过清洁机构实现了清除闸体内壁上杂质的功能,防止杂质影响密封盘与闸体内壁之间的密封性。
Flood prevention gate for water conservancy project
The flood prevention gate for the water conservancy project comprises a gate body and two connecting pipes, mounting holes are formed in the two sides of the gate body, the connecting pipes correspond to the mounting holes in a one-to-one mode, one ends of the connecting pipes are inserted into the mounting holes, the other ends of the connecting pipes are located outside the gate body, and the connecting pipes are connected with the inner walls of the mounting holes in a sealed mode. A lifting device is arranged in the brake body, an executing mechanism and a cleaning mechanism are arranged in the brake body, the executing mechanism and the cleaning mechanism are both located above the connecting pipe, and the executing mechanism comprises a guide pipe, a lifting disc, a lifting pipe, a connecting block, two limiting blocks and two executing assemblies; according to the flood prevention gate for the water conservancy project, the opening and closing function is achieved through the executing mechanism, in addition, the function of removing impurities on the inner wall of the gate body is achieved through the cleaning mechanism, and the impurities are prevented from affecting the sealing performance between the sealing disc and the inner wall of the gate body.
本发明涉及一种水利工程用防汛闸门,包括闸体和两个连接管,所述闸体的两侧均设有安装孔,所述连接管与安装孔一一对应,所述连接管的一端插入安装孔,所述连接管的另一端位于闸体的外部,所述连接管与安装孔的内壁密封连接,所述闸体内设有升降装置,所述闸体内设有执行机构和清洁机构,所述执行机构和清洁机构均位于连接管的上方,所述执行机构包括导管、升降盘、升降管、连接块、两个限位块和两个执行组件,该水利工程用防汛闸门通过执行机构实现了启闭的功能,不仅如此,还通过清洁机构实现了清除闸体内壁上杂质的功能,防止杂质影响密封盘与闸体内壁之间的密封性。
Flood prevention gate for water conservancy project
一种水利工程用防汛闸门
WANG CHANGREN (author)
2022-05-31
Patent
Electronic Resource
Chinese