A platform for research: civil engineering, architecture and urbanism
Novel hoisting device for road bridge
The invention provides a novel hoisting device for a road bridge. The novel hoisting device for the road bridge comprises a driving device, a regulating device, a supporting plate and a lifting device; the regulating device is arranged at the upper end of the driving device; the supporting plate is arranged at the upper end of the regulating device; and the lifting device is mounted at the upper end of the supporting plate. The novel hoisting device for the road bridge can solve the main problems in the process of hoisting a bridge span structure by existing hoisting equipment: a, the bridge span structure is not fixed firmly in the ascending and descending process, which easily causes the bridge span structure to slide down; and b, the direction of the bridge span structure is difficult to adjust in the process of lifting the bridge span structure by the existing hoisting equipment, resulting in that the position of the bridge span structure mounted on a pier is deviated and needs tobe adjusted for plenty of time and the construction efficiency of the bridge is affected.
本发明提供了一种道路桥梁用新型吊装装置,包括驱动装置、调节装置、支撑板和起吊装置;所述驱动装置的上端设置有调节装置,调节装置的上端设置有支撑板,支撑板的上端安装有起吊装置;本发明可以解决现有的起吊设备在吊装桥跨结构的过程中主要存在的a:对桥跨结构进行升降的过程中固定不牢靠,容易造成桥跨结构滑落;b:现有的吊装设备在吊升桥跨结构的过程中难以调节桥跨结构的方向;导致安装在桥墩上的桥跨结构位置偏离需要耗费大量时间进行调节,进而影响桥梁施工效率等问题。
Novel hoisting device for road bridge
The invention provides a novel hoisting device for a road bridge. The novel hoisting device for the road bridge comprises a driving device, a regulating device, a supporting plate and a lifting device; the regulating device is arranged at the upper end of the driving device; the supporting plate is arranged at the upper end of the regulating device; and the lifting device is mounted at the upper end of the supporting plate. The novel hoisting device for the road bridge can solve the main problems in the process of hoisting a bridge span structure by existing hoisting equipment: a, the bridge span structure is not fixed firmly in the ascending and descending process, which easily causes the bridge span structure to slide down; and b, the direction of the bridge span structure is difficult to adjust in the process of lifting the bridge span structure by the existing hoisting equipment, resulting in that the position of the bridge span structure mounted on a pier is deviated and needs tobe adjusted for plenty of time and the construction efficiency of the bridge is affected.
本发明提供了一种道路桥梁用新型吊装装置,包括驱动装置、调节装置、支撑板和起吊装置;所述驱动装置的上端设置有调节装置,调节装置的上端设置有支撑板,支撑板的上端安装有起吊装置;本发明可以解决现有的起吊设备在吊装桥跨结构的过程中主要存在的a:对桥跨结构进行升降的过程中固定不牢靠,容易造成桥跨结构滑落;b:现有的吊装设备在吊升桥跨结构的过程中难以调节桥跨结构的方向;导致安装在桥墩上的桥跨结构位置偏离需要耗费大量时间进行调节,进而影响桥梁施工效率等问题。
Novel hoisting device for road bridge
一种道路桥梁用新型吊装装置
SHAN BAOGUANG (author) / FU XIBO (author) / DU DEGANG (author) / CHEN JIAN (author) / CAO ZHITAO (author) / SONG FANGCHEN (author)
2020-08-28
Patent
Electronic Resource
Chinese
IPC:
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E01D
BRIDGES
,
Brücken
Hoisting device for mounting bridge body of road and bridge building and mounting method
European Patent Office | 2023
|Prefabricated bridge pier stud hoisting device and hoisting method
European Patent Office | 2020
|Integrated hoisting device and hoisting method for through arch bridge cable hoisting steel girder
European Patent Office | 2024
|