Tunnel secondary lining full-section integrated construction bogie, and method for secondary lining building with same
The invention relates to the technical field of tunnel secondary lining construction, in particular to a tunnel secondary lining full-section integrated construction bogie, and a method for secondarylining building with the same. A needle-beam landing stage is movably arranged in a tunnel in a supporting manner, and can move along the tunnel for adjusting; a secondary lining bogie body, a waterproof plate reinforcing bar mounting bogie and an inverted arch filling die plate are mounted on the needle-beam landing stage, can be independently supported on the ground, and can move along the needle-beam landing stage to realize stable construction; the front end close to the needle-beam landing stage, of the waterproof plate reinforcing bar mounting bogie is used for mounting of waterproof plates and reinforcing bars; secondary lining die plates are arranged close to the outside of the needle-beam landing stage, of the secondary lining bogie body; complete secondary lining surface construction can be performed on the inner wall of the tunnel through the secondary lining die plates; and the inverted arch filling die plate is arranged at the beam bottom adjacent to the rear end of the needle beam landing stage, and is adjusted through the traction of a traction motor to perform filling of an inverted arch. According to the scheme of the tunnel secondary lining full-section integratedconstruction bogie disclosed by the invention, independent construction of each flow can be performed, the engineering quality is guaranteed, and the working duration is controllable.
本发明涉及隧道二衬施工技术领域,具体涉及一种隧道二衬全断面一体式施工台车以及利用该施工台车进行二次衬砌的方法,针梁栈桥活动支撑设置在隧道内并可沿隧道移动调节,二衬台车、防水板钢筋安装台车和仰拱填充模板均安装在针梁栈桥上并可独立支撑在地面,三者均可沿针梁栈桥移动以实现施工的稳定进行,防水板钢筋安装台车靠近针梁栈桥的前端处用以进行防水板和钢筋的安装,二衬台车靠近针梁栈桥的外部设置有二衬模板,通过二衬模板可实现隧道内壁的二衬面完整施工,仰拱填充模板设置在靠近针梁栈桥的后端的梁底处并由牵引马达牵引调节以进行仰拱的填充,本方案的台车可进行各个流程的独立施工,保证工程质量的同时实现工期可控。
Tunnel secondary lining full-section integrated construction bogie, and method for secondary lining building with same
The invention relates to the technical field of tunnel secondary lining construction, in particular to a tunnel secondary lining full-section integrated construction bogie, and a method for secondarylining building with the same. A needle-beam landing stage is movably arranged in a tunnel in a supporting manner, and can move along the tunnel for adjusting; a secondary lining bogie body, a waterproof plate reinforcing bar mounting bogie and an inverted arch filling die plate are mounted on the needle-beam landing stage, can be independently supported on the ground, and can move along the needle-beam landing stage to realize stable construction; the front end close to the needle-beam landing stage, of the waterproof plate reinforcing bar mounting bogie is used for mounting of waterproof plates and reinforcing bars; secondary lining die plates are arranged close to the outside of the needle-beam landing stage, of the secondary lining bogie body; complete secondary lining surface construction can be performed on the inner wall of the tunnel through the secondary lining die plates; and the inverted arch filling die plate is arranged at the beam bottom adjacent to the rear end of the needle beam landing stage, and is adjusted through the traction of a traction motor to perform filling of an inverted arch. According to the scheme of the tunnel secondary lining full-section integratedconstruction bogie disclosed by the invention, independent construction of each flow can be performed, the engineering quality is guaranteed, and the working duration is controllable.
本发明涉及隧道二衬施工技术领域,具体涉及一种隧道二衬全断面一体式施工台车以及利用该施工台车进行二次衬砌的方法,针梁栈桥活动支撑设置在隧道内并可沿隧道移动调节,二衬台车、防水板钢筋安装台车和仰拱填充模板均安装在针梁栈桥上并可独立支撑在地面,三者均可沿针梁栈桥移动以实现施工的稳定进行,防水板钢筋安装台车靠近针梁栈桥的前端处用以进行防水板和钢筋的安装,二衬台车靠近针梁栈桥的外部设置有二衬模板,通过二衬模板可实现隧道内壁的二衬面完整施工,仰拱填充模板设置在靠近针梁栈桥的后端的梁底处并由牵引马达牵引调节以进行仰拱的填充,本方案的台车可进行各个流程的独立施工,保证工程质量的同时实现工期可控。
Tunnel secondary lining full-section integrated construction bogie, and method for secondary lining building with same
一种隧道二衬全断面一体式施工台车及利用其二次衬砌的方法
LIU SHUNCHENG (author) / WANG KEZENG (author)
2020-08-28
Patent
Electronic Resource
Chinese
Secondary lining full-section rapid cleaning device for tunnel in operation
European Patent Office | 2021
|Automatic feasible tunnel secondary lining maintenance device
European Patent Office | 2022
|Full-automatic multifunctional device for tunnel engineering secondary lining concrete curing
European Patent Office | 2024
|