The invention relates to the field of building construction, in particular to a constructional column chiseling-free construction method beneficial to controlling the top sealing quality of a constructional column. The method includes the following steps: firstly, wall building, wherein during wall building, mould bricks are built together with a wall body at a constructional column design position; secondly, pouring assembly installation, wherein when the wall body in the first step is built to the top, a gap for pouring constructional column concrete is reserved at the top of the constructional column design position, and a pouring assembly for pouring the concrete is arranged at the gap position of the wall body; thirdly, constructional column pouring, wherein the concrete is poured into a construction column pouring cavity through the pouring assembly, after concrete pouring is completed, the gap at the top of the constructional column is sealed through a sealing plate, a pouring bucket of the pouring assembly is detached, and concrete in the pouring bucket is recycled; and fourthly, maintenance. The constructional column chiseling-free construction method firstly simplifies the construction, greatly shortens the construction period and greatly improves the surface flatness of the constructional column.
本发明涉及建筑施工领域,特别涉及一种利于控制构造柱顶部封口质量的构造柱免剔凿施工方法,包括下述步骤:一、墙体砌筑:墙体砌筑时,在构造柱设计位置采用模具砖与墙体一起砌筑,二、浇筑组件安装:在步骤一的墙体砌筑到顶时,构造柱设计位置的顶部位置留置用于浇筑构造柱混凝土的空缺,并在空缺处的墙体上设置用于浇筑混凝土的浇筑组件;三、构造柱浇筑:通过浇筑组件向构造柱浇筑腔内浇筑混凝土,在混凝土浇筑完毕后,采用封板封闭构造柱顶部位置的空缺,拆除浇筑组件的浇筑斗,并将浇筑斗内的混凝土回收利用;四、养护。本申请的构造柱免剔凿方法,首先是简化了施工,大幅缩短了工期,大幅提高了构造柱表面平整度。
Constructional column chiseling-free construction method beneficial to controlling top sealing quality of constructional column
The invention relates to the field of building construction, in particular to a constructional column chiseling-free construction method beneficial to controlling the top sealing quality of a constructional column. The method includes the following steps: firstly, wall building, wherein during wall building, mould bricks are built together with a wall body at a constructional column design position; secondly, pouring assembly installation, wherein when the wall body in the first step is built to the top, a gap for pouring constructional column concrete is reserved at the top of the constructional column design position, and a pouring assembly for pouring the concrete is arranged at the gap position of the wall body; thirdly, constructional column pouring, wherein the concrete is poured into a construction column pouring cavity through the pouring assembly, after concrete pouring is completed, the gap at the top of the constructional column is sealed through a sealing plate, a pouring bucket of the pouring assembly is detached, and concrete in the pouring bucket is recycled; and fourthly, maintenance. The constructional column chiseling-free construction method firstly simplifies the construction, greatly shortens the construction period and greatly improves the surface flatness of the constructional column.
本发明涉及建筑施工领域,特别涉及一种利于控制构造柱顶部封口质量的构造柱免剔凿施工方法,包括下述步骤:一、墙体砌筑:墙体砌筑时,在构造柱设计位置采用模具砖与墙体一起砌筑,二、浇筑组件安装:在步骤一的墙体砌筑到顶时,构造柱设计位置的顶部位置留置用于浇筑构造柱混凝土的空缺,并在空缺处的墙体上设置用于浇筑混凝土的浇筑组件;三、构造柱浇筑:通过浇筑组件向构造柱浇筑腔内浇筑混凝土,在混凝土浇筑完毕后,采用封板封闭构造柱顶部位置的空缺,拆除浇筑组件的浇筑斗,并将浇筑斗内的混凝土回收利用;四、养护。本申请的构造柱免剔凿方法,首先是简化了施工,大幅缩短了工期,大幅提高了构造柱表面平整度。
Constructional column chiseling-free construction method beneficial to controlling top sealing quality of constructional column
一种利于控制构造柱顶部封口质量的构造柱免剔凿施工方法
TANG KUN (author) / WANG GAN (author) / WEI SHUHAO (author) / ZHANG WEI (author) / CHEN HAO (author) / CHEN PENG (author) / LEI YUANFANG (author) / YIN YANLEI (author)
2020-09-04
Patent
Electronic Resource
Chinese
Constructional column top chiseling-free device and construction method
European Patent Office | 2021
|Constructional column dustpan mouth chiseling prevention apparatus
European Patent Office | 2020
|Constructional column construction method and constructional column mold
European Patent Office | 2021
|European Patent Office | 2023
|Constructional column mold and construction method of constructional column mold
European Patent Office | 2024
|