A platform for research: civil engineering, architecture and urbanism
Working method of unloading platform for building construction
The invention relates to the technical field of building engineering, and discloses a working method of an unloading platform for building construction. The unloading platform for building construction comprises a transverse plate, two steel plates are symmetrically welded to the side wall of the left side of the transverse plate, the same U-shaped guard plate is fixedly welded to the side walls of the opposite sides of the two steel plates, four U-shaped rings are fixedly connected to the side wall of the upper side of the U-shaped guard plate and are all externally connected with steel ropes, fixing rods are fixedly welded at the ends, far away from the transverse plate, of the two steel plates, the two fixing rods are both movably sleeved with three U-shaped fasteners, a plurality of pieces of I-shaped steel are fixedly welded between the two steel plates and uniformly arranged, supporting plates are fixedly welded on the side walls of the upper sides of the multiple pieces of I-shaped steel, and a bottom plate is arranged on the supporting plates. According to the working method of the unloading platform for building construction, the labor intensity of construction workers isreduced, and the use convenience of the unloading platform is improved.
本发明涉及建筑工程技术领域,且公开了一种建筑施工用卸料平台的工作方法,所述建筑施工用卸料平台包括横板,所述横板左侧的侧壁对称焊接有两个钢板,两个所述钢板相背一侧的侧壁固定焊接有同一个U型护板,所述U型护板上侧的侧壁固定连接有四个U型环,四个所述U型环外均连接有钢绳,两个所述钢板远离横板的一端均固定焊接有固定杆,两个所述固定杆外均活动套设有三个U型紧固件,两个所述钢板之间固定焊接有多个工字钢,多个所述工字钢均匀设置,多个所述工字钢的上侧的侧壁固定焊接有托板,所述托板的上方设置有底板。该建筑施工用卸料平台的工作方法,降低了建筑工人的劳动强度,提高了卸料平台使用的便利性。
Working method of unloading platform for building construction
The invention relates to the technical field of building engineering, and discloses a working method of an unloading platform for building construction. The unloading platform for building construction comprises a transverse plate, two steel plates are symmetrically welded to the side wall of the left side of the transverse plate, the same U-shaped guard plate is fixedly welded to the side walls of the opposite sides of the two steel plates, four U-shaped rings are fixedly connected to the side wall of the upper side of the U-shaped guard plate and are all externally connected with steel ropes, fixing rods are fixedly welded at the ends, far away from the transverse plate, of the two steel plates, the two fixing rods are both movably sleeved with three U-shaped fasteners, a plurality of pieces of I-shaped steel are fixedly welded between the two steel plates and uniformly arranged, supporting plates are fixedly welded on the side walls of the upper sides of the multiple pieces of I-shaped steel, and a bottom plate is arranged on the supporting plates. According to the working method of the unloading platform for building construction, the labor intensity of construction workers isreduced, and the use convenience of the unloading platform is improved.
本发明涉及建筑工程技术领域,且公开了一种建筑施工用卸料平台的工作方法,所述建筑施工用卸料平台包括横板,所述横板左侧的侧壁对称焊接有两个钢板,两个所述钢板相背一侧的侧壁固定焊接有同一个U型护板,所述U型护板上侧的侧壁固定连接有四个U型环,四个所述U型环外均连接有钢绳,两个所述钢板远离横板的一端均固定焊接有固定杆,两个所述固定杆外均活动套设有三个U型紧固件,两个所述钢板之间固定焊接有多个工字钢,多个所述工字钢均匀设置,多个所述工字钢的上侧的侧壁固定焊接有托板,所述托板的上方设置有底板。该建筑施工用卸料平台的工作方法,降低了建筑工人的劳动强度,提高了卸料平台使用的便利性。
Working method of unloading platform for building construction
一种建筑施工用卸料平台的工作方法
LIU ZHIMIN (author)
2020-09-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste