A platform for research: civil engineering, architecture and urbanism
Prefabricated energy pile
The invention discloses a prefabricated energy pile. The prefabricated energy pile comprises a pile body, at least one pair of circulating pipes are embedded in the pile body, circulating pipes between adjacent sub pile bodies are in conducting connection, one pair of circulating pipes in the sub pile bodies at the bottom are connected and communicated at the bottom, the circulating pipes in the pile body and pipelines of an upper building form circulation, and a circulating fan is arranged on a circulating system. The prefabricated energy pile is convenient to rapidly connect and form and rapidly forms the circulating pipelines.
本发明公开了一种预制能源桩,包括桩体,桩体内埋设有至少一对循环管,相邻分桩体之间的循环管相互导接,底部的分桩体内的一对循环管于底部连接导通,桩体内的循环管与上部建筑的管道形成循环,循环系统配置有循环风扇,该预制能源桩便于快速连接形成并快速形成循环管道。
Prefabricated energy pile
The invention discloses a prefabricated energy pile. The prefabricated energy pile comprises a pile body, at least one pair of circulating pipes are embedded in the pile body, circulating pipes between adjacent sub pile bodies are in conducting connection, one pair of circulating pipes in the sub pile bodies at the bottom are connected and communicated at the bottom, the circulating pipes in the pile body and pipelines of an upper building form circulation, and a circulating fan is arranged on a circulating system. The prefabricated energy pile is convenient to rapidly connect and form and rapidly forms the circulating pipelines.
本发明公开了一种预制能源桩,包括桩体,桩体内埋设有至少一对循环管,相邻分桩体之间的循环管相互导接,底部的分桩体内的一对循环管于底部连接导通,桩体内的循环管与上部建筑的管道形成循环,循环系统配置有循环风扇,该预制能源桩便于快速连接形成并快速形成循环管道。
Prefabricated energy pile
一种预制能源桩
SONG JUNYONG (author) / ZHANG JINMIAO (author) / LOU HUISU (author) / LIN KE (author) / LIN FENG (author) / CHEN XIANGJIE (author) / YAO LIANGHUA (author) / LI HAO (author)
2020-09-08
Patent
Electronic Resource
Chinese
Production method of prefabricated pile and prefabricated solid pile
European Patent Office | 2024
|Prefabricated pile mold and prefabricated pipe pile produced by same
European Patent Office | 2021
|European Patent Office | 2022
|BURIED STRUCTURE OF PREFABRICATED PILE AND BURYING METHOD OF PREFABRICATED PILE
European Patent Office | 2015
|Prefabricated member for connection of prefabricated pile
European Patent Office | 2015
|