The invention discloses an environmentally-friendly assembling type vertical protection method, which comprises the following steps of: S1: foundation pit digging and piling: firstly, carrying out layering digging on a foundation pit, combining digging depth with a construction organization requirement, when a layering digging depth is 2-3 m, cleaning a soil layer between piles, after the soil layer finishes being cleaned, driving an anchor rod into a side wall of the dug foundation pit, and meanwhile, pouring a pouring pile near the side wall of the foundation pit. The invention relates to the technical field of the vertical protection of the soil layer. According to the environmentally-friendly assembling type vertical protection method, an assembling type face plate is arranged, the assembling type face plate can quickly seal the wall of the dug foundation pit in an early stage that a vertical dug surface is exposed, secondary dust generation is reduced, water and soil loss is reduced, in addition, the assembling type face plate can lower washing for the bare soil surface of the foundation pit wall during a rainstorm period and does not need to be manually cured, the power facility requirements and the manual operation requirements of the operation can be greatly lowered, injury on people by flying dust can be reduced, and excessive waste, including mud, waste gases and thelike, can be avoided.
本发明公开了一种绿色装配式垂直防护的方法,S1、基坑开挖打桩:首先将基坑进行分层开挖,开挖深度结合施工组织要求,当分层开挖深度至2‑3m时,再对桩间土层进行清理,清理完成后,在开挖基坑的侧壁上将锚杆打入,同时在基坑的侧壁旁边浇筑灌注桩,本发明涉及土层垂直防护技术领域。该绿色装配式垂直防护的方法,通过设置装配式面板,装配式面板能在垂直开挖面露早期对开挖基坑壁进行快速封闭,减少二次产尘,减少水土流失,并且装配式面板可以降低暴雨期间对基坑壁裸露土面的冲刷,无需人工对装配式面板进行养护,大大减少了作业的动力设施需求和人工作业需求,减少了扬尘对人的伤害,不会产生过多的泥浆、废气等废弃物。
The invention discloses an environmentally-friendly assembling type vertical protection method, which comprises the following steps of: S1: foundation pit digging and piling: firstly, carrying out layering digging on a foundation pit, combining digging depth with a construction organization requirement, when a layering digging depth is 2-3 m, cleaning a soil layer between piles, after the soil layer finishes being cleaned, driving an anchor rod into a side wall of the dug foundation pit, and meanwhile, pouring a pouring pile near the side wall of the foundation pit. The invention relates to the technical field of the vertical protection of the soil layer. According to the environmentally-friendly assembling type vertical protection method, an assembling type face plate is arranged, the assembling type face plate can quickly seal the wall of the dug foundation pit in an early stage that a vertical dug surface is exposed, secondary dust generation is reduced, water and soil loss is reduced, in addition, the assembling type face plate can lower washing for the bare soil surface of the foundation pit wall during a rainstorm period and does not need to be manually cured, the power facility requirements and the manual operation requirements of the operation can be greatly lowered, injury on people by flying dust can be reduced, and excessive waste, including mud, waste gases and thelike, can be avoided.
本发明公开了一种绿色装配式垂直防护的方法,S1、基坑开挖打桩:首先将基坑进行分层开挖,开挖深度结合施工组织要求,当分层开挖深度至2‑3m时,再对桩间土层进行清理,清理完成后,在开挖基坑的侧壁上将锚杆打入,同时在基坑的侧壁旁边浇筑灌注桩,本发明涉及土层垂直防护技术领域。该绿色装配式垂直防护的方法,通过设置装配式面板,装配式面板能在垂直开挖面露早期对开挖基坑壁进行快速封闭,减少二次产尘,减少水土流失,并且装配式面板可以降低暴雨期间对基坑壁裸露土面的冲刷,无需人工对装配式面板进行养护,大大减少了作业的动力设施需求和人工作业需求,减少了扬尘对人的伤害,不会产生过多的泥浆、废气等废弃物。
Assembling type electric environmentally-friendly deep water dredging boat
European Patent Office | 2020
|Environmentally Friendly Coastal Protection: The ECOPRO Project
British Library Conference Proceedings | 1999
|vertical fall prevention network for environmentally friendly building
European Patent Office | 2022
|European Patent Office | 2023
|ENVIRONMENTALLY FRIENDLY COMPOSITION, AND ENVIRONMENTALLY FRIENDLY HARDENED BODY
European Patent Office | 2019
|