Waterproof method for pile head of pre-pavement and reverse bonding waterproof roll
A waterproof method for a pile head of a pre-pavement and reverse bonding waterproof roll is characterized by comprising the following steps that a, building waterproof construction is carried out within a certain range of the pile head; b, building waterproofing is carried out on the part of the pile head; and c, building waterproofing is carried out on the part out of the pile head by 250 mm. The waterproof method for the pile head of the pre-pavement and reverse bonding waterproof roll has the advantages that joints (2) in page 10J301-59 are used as the prototype, a cement-based permeable crystallization waterproof layer is adopted for replacing cement-based waterproof coating, the waterproof layer and the pile head are combined better, construction is simple, and the waterproof layer on the waterproof portion of the pile head is not prone to being destroyed; integrity is good, the reworking and maintenance probability of waterproof operation of the pile head can be greatly reduced,and the labor efficiency and the waterproof effect are improved; and the waterproof method has the advantage of solving the problem that pile head waterproof joints in page 10J301-59 are not suitablefor pile head waterproofing of the pre-pavement and reverse bonding waterproof roll.
一种预铺反粘防水卷材桩头防水方法,其特征在于包括以下步骤:a、在桩头一定范围内进行建筑防水施工,b、桩头部分建筑防水做法,c、桩头250mm外部分建筑防水做法。本发明的预铺反粘防水卷材桩头防水方法具有以10J301‑59②节点为原型,采用水泥基渗透结晶防水层代替水泥基防水涂料,使防水层与桩头结合更好,施工简单,桩头防水部位的防水层不易被破坏的优点,整体性好,可以大大减少桩头防水的返工与维修概率,提高劳动效率与防水效果和解决10J301‑59页桩头防水节点不适合预铺反粘防水卷材的桩头防水做法的优点。
Waterproof method for pile head of pre-pavement and reverse bonding waterproof roll
A waterproof method for a pile head of a pre-pavement and reverse bonding waterproof roll is characterized by comprising the following steps that a, building waterproof construction is carried out within a certain range of the pile head; b, building waterproofing is carried out on the part of the pile head; and c, building waterproofing is carried out on the part out of the pile head by 250 mm. The waterproof method for the pile head of the pre-pavement and reverse bonding waterproof roll has the advantages that joints (2) in page 10J301-59 are used as the prototype, a cement-based permeable crystallization waterproof layer is adopted for replacing cement-based waterproof coating, the waterproof layer and the pile head are combined better, construction is simple, and the waterproof layer on the waterproof portion of the pile head is not prone to being destroyed; integrity is good, the reworking and maintenance probability of waterproof operation of the pile head can be greatly reduced,and the labor efficiency and the waterproof effect are improved; and the waterproof method has the advantage of solving the problem that pile head waterproof joints in page 10J301-59 are not suitablefor pile head waterproofing of the pre-pavement and reverse bonding waterproof roll.
一种预铺反粘防水卷材桩头防水方法,其特征在于包括以下步骤:a、在桩头一定范围内进行建筑防水施工,b、桩头部分建筑防水做法,c、桩头250mm外部分建筑防水做法。本发明的预铺反粘防水卷材桩头防水方法具有以10J301‑59②节点为原型,采用水泥基渗透结晶防水层代替水泥基防水涂料,使防水层与桩头结合更好,施工简单,桩头防水部位的防水层不易被破坏的优点,整体性好,可以大大减少桩头防水的返工与维修概率,提高劳动效率与防水效果和解决10J301‑59页桩头防水节点不适合预铺反粘防水卷材的桩头防水做法的优点。
Waterproof method for pile head of pre-pavement and reverse bonding waterproof roll
一种预铺反粘防水卷材桩头防水方法
MENG XIANGBAO (author) / WANG BAOJIAN (author) / WU PENGMIN (author) / LU PENG (author)
2020-09-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile head waterproof structure and pile head waterproof construction method
European Patent Office | 2025
|Pile head waterproof prefabricated part, waterproof structure and construction method thereof
European Patent Office | 2024
|Waterproof roll mounting structure and waterproof roll mounting method
European Patent Office | 2020
|Building waterproof engineering waterproof roll paving method
European Patent Office | 2023
|Underground engineering pile head waterproof treatment method
European Patent Office | 2021
|