A platform for research: civil engineering, architecture and urbanism
The invention relates to a bridge pier prefabricated spliced viaduct which comprises a bridge plate and a plurality of piers supporting the bridge plate. The pier comprises subsections which are distributed in the vertical direction and connected together through a plurality of inserting structures. The inserting structure comprises a segmented steel thread head located on the lower portion and asegmented upper steel thread head located on the upper portion. The lower steel thread head is in threaded connection with the interior of a steel internal thread sleeve provided with a steel connecting cylinder; the upper threaded head is in threaded connection with a connecting steel sleeve; the steel connecting cylinder is arranged in the connecting steel sleeve in a penetrating mode, a clamping ring groove is formed in the steel connecting cylinder, an inclined bottom sliding groove is formed in the inner circumferential face of the connecting steel sleeve, steel barbs are connected into the inclined bottom sliding groove in a sliding mode, barb downward-moving springs for driving all the steel barbs to slide downwards are arranged in the connecting steel sleeve, and the steel barbs are connected into the clamping ring groove in a hooked mode. The spliced viaduct has the advantage that the construction period can be shortened, and the problems that due to the fact that piers of anexisting viaduct are of a cast-in-place structure, the construction period is long when the piers are high, and a formwork supporting frame is inconvenient to build are solved.
本发明涉及一种桥墩预制拼接式高架桥,包括桥板和支撑桥板的若干桥墩,桥墩包括沿上下方向分布的通过若干个插接结构连接在一起的分段,插接结构包括位于下方的分段的钢螺纹头和位于上方的分段的上钢螺纹头,下钢螺纹头螺纹连接在设有钢连接圆柱的钢内螺纹套筒内上,上螺纹头上螺纹连接有连接钢套,钢连接圆柱穿设在连接钢套内,钢连接圆柱设有卡接环槽,连接钢套的内周面上设有斜底滑槽,斜底滑槽内滑动连接有钢倒钩,连接钢套内设有驱动所有的钢倒钩朝下滑动的倒钩下移弹簧,钢倒钩钩接在卡接环槽内。本发明具有能够缩短施工周期的优点,解决了现有的高架桥的桥墩为现浇结构导致的桥墩高时施工周期长且搭建模板支撑架时不便的问题。
The invention relates to a bridge pier prefabricated spliced viaduct which comprises a bridge plate and a plurality of piers supporting the bridge plate. The pier comprises subsections which are distributed in the vertical direction and connected together through a plurality of inserting structures. The inserting structure comprises a segmented steel thread head located on the lower portion and asegmented upper steel thread head located on the upper portion. The lower steel thread head is in threaded connection with the interior of a steel internal thread sleeve provided with a steel connecting cylinder; the upper threaded head is in threaded connection with a connecting steel sleeve; the steel connecting cylinder is arranged in the connecting steel sleeve in a penetrating mode, a clamping ring groove is formed in the steel connecting cylinder, an inclined bottom sliding groove is formed in the inner circumferential face of the connecting steel sleeve, steel barbs are connected into the inclined bottom sliding groove in a sliding mode, barb downward-moving springs for driving all the steel barbs to slide downwards are arranged in the connecting steel sleeve, and the steel barbs are connected into the clamping ring groove in a hooked mode. The spliced viaduct has the advantage that the construction period can be shortened, and the problems that due to the fact that piers of anexisting viaduct are of a cast-in-place structure, the construction period is long when the piers are high, and a formwork supporting frame is inconvenient to build are solved.
本发明涉及一种桥墩预制拼接式高架桥,包括桥板和支撑桥板的若干桥墩,桥墩包括沿上下方向分布的通过若干个插接结构连接在一起的分段,插接结构包括位于下方的分段的钢螺纹头和位于上方的分段的上钢螺纹头,下钢螺纹头螺纹连接在设有钢连接圆柱的钢内螺纹套筒内上,上螺纹头上螺纹连接有连接钢套,钢连接圆柱穿设在连接钢套内,钢连接圆柱设有卡接环槽,连接钢套的内周面上设有斜底滑槽,斜底滑槽内滑动连接有钢倒钩,连接钢套内设有驱动所有的钢倒钩朝下滑动的倒钩下移弹簧,钢倒钩钩接在卡接环槽内。本发明具有能够缩短施工周期的优点,解决了现有的高架桥的桥墩为现浇结构导致的桥墩高时施工周期长且搭建模板支撑架时不便的问题。
Bridge pier prefabricated spliced viaduct
桥墩预制拼接式高架桥
WEI WEIQING (author)
2020-09-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
/
G01V
Geophysik
,
GEOPHYSICS
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Pier prefabricated spliced viaduct capable of shortening construction period
European Patent Office | 2021
Pier prefabricated spliced viaduct building method capable of shortening construction period
European Patent Office | 2021
Construction method for spliced viaduct with prefabricated piers
European Patent Office | 2020
|Pier spliced and assembled by prefabricated pier universal modules
European Patent Office | 2024
|