A platform for research: civil engineering, architecture and urbanism
Prefabricated assembly type square well
The invention relates to the technical field of cable wells, in particular to a prefabricated assembly type square well and an assembly method thereof. The prefabricated assembly type square well comprises a foundation plate, a bottom plate, side plates and a top cover, wherein the center of the upper surface of the foundation plate is provided with a square hole, the upper end of the foundation plate is provided with the bottom plate, the center of the bottom plate is provided with a downwards-sunken square water gathering well, the square water gathering well is arranged on the inner wall ofthe square hole in a sleeved mode, four mounting grooves are formed in the upper end face of the bottom plate and located in the four corners of a square respectively, one side plate is fixedly mounted between every two adjacent mounting grooves through bolts, the four side plates are mounted on the upper end face of the bottom plate in total, and the four side plates are precisely matched to jointly define a square well sleeve. According to the prefabricated assembly type square well, the arrangement of balls can convert sliding friction force of a cable into rolling friction force so that the friction force can be further reduced, then threading and transportation of the cable are facilitated, threading and feeding are more labor-saving, the labor intensity of workers is reduced, and great application prospects are achieved.
本发明涉及电缆井技术领域,具体涉及一种预制装配式方井及其装配方法,包括基础板、底板、侧板和顶盖,基础板的上表面中心处开设有方孔,基础板的上端安装有底板,底板的中心处设有向下凹陷的方形聚水井,方形聚水井套设于方孔内壁;底板的上端面开设有四个呈安装槽,四个安装槽分别位于正方形的四个角落,相邻的两个安装槽之间通过螺栓固定安装有一块侧板,底板上端面共安装有四块侧板,且四块侧板精密契合共同围成一个方形井套;本发明中滚珠的设置能将电缆线的滑动摩擦力转换成滚动摩擦力,进一步能减小摩擦力,从而便于电缆线的穿线及运输,也穿线、送线也更加省力,降低了工人的劳动强度,具有极大的应用前景。
Prefabricated assembly type square well
The invention relates to the technical field of cable wells, in particular to a prefabricated assembly type square well and an assembly method thereof. The prefabricated assembly type square well comprises a foundation plate, a bottom plate, side plates and a top cover, wherein the center of the upper surface of the foundation plate is provided with a square hole, the upper end of the foundation plate is provided with the bottom plate, the center of the bottom plate is provided with a downwards-sunken square water gathering well, the square water gathering well is arranged on the inner wall ofthe square hole in a sleeved mode, four mounting grooves are formed in the upper end face of the bottom plate and located in the four corners of a square respectively, one side plate is fixedly mounted between every two adjacent mounting grooves through bolts, the four side plates are mounted on the upper end face of the bottom plate in total, and the four side plates are precisely matched to jointly define a square well sleeve. According to the prefabricated assembly type square well, the arrangement of balls can convert sliding friction force of a cable into rolling friction force so that the friction force can be further reduced, then threading and transportation of the cable are facilitated, threading and feeding are more labor-saving, the labor intensity of workers is reduced, and great application prospects are achieved.
本发明涉及电缆井技术领域,具体涉及一种预制装配式方井及其装配方法,包括基础板、底板、侧板和顶盖,基础板的上表面中心处开设有方孔,基础板的上端安装有底板,底板的中心处设有向下凹陷的方形聚水井,方形聚水井套设于方孔内壁;底板的上端面开设有四个呈安装槽,四个安装槽分别位于正方形的四个角落,相邻的两个安装槽之间通过螺栓固定安装有一块侧板,底板上端面共安装有四块侧板,且四块侧板精密契合共同围成一个方形井套;本发明中滚珠的设置能将电缆线的滑动摩擦力转换成滚动摩擦力,进一步能减小摩擦力,从而便于电缆线的穿线及运输,也穿线、送线也更加省力,降低了工人的劳动强度,具有极大的应用前景。
Prefabricated assembly type square well
一种预制装配式方井
SONG YAJIE (author) / WANG NENGGAO (author) / GAO WENLIANG (author) / LI CHENGBAO (author) / ZHANG SHAOLEI (author) / WANG GUANGLIANG (author) / JIANG FEI (author) / CHENG JI (author) / HE MINGJUN (author) / ZHANG XU (author)
2020-09-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
European Patent Office | 2024
|Prefabricated assembly type rain sewage inspection well launder
European Patent Office | 2022
|