A platform for research: civil engineering, architecture and urbanism
Large-span net rack jacking construction process
The invention relates to a large-span net rack jacking construction process. The process comprises the following steps of calculating the jacking number and position; assembling a net rack; mounting ajacking device; reinforcing the floor; jacking the net rack, starting a hydraulic pump to enable a piston rod of a hydraulic oil cylinder to synchronously rise for one stroke, mounting a second standard knot above a first standard knot, enabling a cylinder body of the hydraulic oil cylinder to rise through oil return of the hydraulic pump, and moving a cross beam to the second standard knot to complete one stroke, repeating the net rack jacking step, stopping jacking when the net rack rises to 10-20 cm above the designed elevation; and unloading mounting, enabling the hydraulic oil cylinder to synchronously descend to drive the net rack to fall on a preset mounting base, and completing jacking construction. The process has the effects of shortening the construction period and improving the installation quality and the construction safety.
本申请涉及一种大跨度网架顶升施工工艺,其包括以下步骤,顶升数量和位置计算;网架拼装;安装顶升装置;加固楼板;网架顶升,启动液压泵使液压油缸的活塞杆同步上升一个行程,在第一个标准节的上方安装第二个标准节,液压泵回油使液压油缸的缸体上升,将横梁移动至第二个标准节,完成一个行程,重复网架顶升步骤使网架上升至设计标高以上10‑20cm时,停止顶升;卸载安装,使液压油缸同步下降带动网架落在预设安装座上,完成顶升施工。本申请具有缩短施工周期、提高安装质量和施工安全性的效果。
Large-span net rack jacking construction process
The invention relates to a large-span net rack jacking construction process. The process comprises the following steps of calculating the jacking number and position; assembling a net rack; mounting ajacking device; reinforcing the floor; jacking the net rack, starting a hydraulic pump to enable a piston rod of a hydraulic oil cylinder to synchronously rise for one stroke, mounting a second standard knot above a first standard knot, enabling a cylinder body of the hydraulic oil cylinder to rise through oil return of the hydraulic pump, and moving a cross beam to the second standard knot to complete one stroke, repeating the net rack jacking step, stopping jacking when the net rack rises to 10-20 cm above the designed elevation; and unloading mounting, enabling the hydraulic oil cylinder to synchronously descend to drive the net rack to fall on a preset mounting base, and completing jacking construction. The process has the effects of shortening the construction period and improving the installation quality and the construction safety.
本申请涉及一种大跨度网架顶升施工工艺,其包括以下步骤,顶升数量和位置计算;网架拼装;安装顶升装置;加固楼板;网架顶升,启动液压泵使液压油缸的活塞杆同步上升一个行程,在第一个标准节的上方安装第二个标准节,液压泵回油使液压油缸的缸体上升,将横梁移动至第二个标准节,完成一个行程,重复网架顶升步骤使网架上升至设计标高以上10‑20cm时,停止顶升;卸载安装,使液压油缸同步下降带动网架落在预设安装座上,完成顶升施工。本申请具有缩短施工周期、提高安装质量和施工安全性的效果。
Large-span net rack jacking construction process
大跨度网架顶升施工工艺
FENG KUNCHANG (author) / ZHAO FENGHUA (author) / WANG YUN (author) / QIANG ANLONG (author) / QIN SONGHE (author) / YE GENLONG (author) / WU XINLI (author) / CHEN LEI (author) / DONG WUJUN (author) / GU KUN (author)
2020-09-29
Patent
Electronic Resource
Chinese
Ground jacking and assembling construction method for large-span net rack
European Patent Office | 2024
|Large-span net rack external expansion assembly integral jacking construction method
European Patent Office | 2020
|Inverted cone jacking method for large-span net rack structure
European Patent Office | 2020
|Large-span net rack dome ring-by-ring assembling and staged jacking construction method
European Patent Office | 2024
|