A platform for research: civil engineering, architecture and urbanism
Construction device and method for concrete pipe pile
The invention discloses a construction device for a concrete pipe pile. The construction device comprises a control machine body. A metal water tank, an operation control chamber and a rectangular block are fixedly connected to the upper surface of the control machine body. A rectangular opening is formed in the upper surface of the rectangular block, and a first metal shaft is fixedly connected to the inner wall of the rectangular opening. The invention further provides a construction method for the concrete pipe pile. The construction method for the concrete pipe pile comprises the followingsteps of S1, firstly opening a protective door to enter an operation control room, and starting equipment. According to the construction device for the concrete pipe pile, through the arrangement ofa first transmission rod, a second transmission rod, a third transmission rod and a pile cutting rack, multiple tools are not needed for auxiliary operation when the device is used for constructing the concrete pipe pile, manual auxiliary operation is reduced during construction, and potential safety hazards of accidents are reduced. The device has the advantages that auxiliary operation of the multiple tools is not needed, the construction operation difficulty is reduced for people, dangerous accidents can be reduced, and safety accidents are avoided.
本发明公开了一种混凝土管桩用施工装置,包括控制机身,所述控制机身的上表面分别固定连接有金属水箱、操作控制室和矩形块,所述矩形块的上表面开设有矩形口,且矩形口的内壁固定连接有第一金属轴;一种混凝土管桩用施方法,包括以下步骤;S1、首先打开防护门进入到操作控制室内部,启动该设备。该混凝土管桩用施工装置,通过设置第一传动杆、第二传动杆、第三传动杆和截桩机架能使该装置在进行混凝土管桩施工时不需要多个工具进行辅助操作,同时在施工时减少人工来辅助操作,减少事故的安全隐患,从而使该装置具有不需要多个工具辅助操作,减小人们施工操作难度的效果,同时能够减少危险事故发生,避免安全事故发生。
Construction device and method for concrete pipe pile
The invention discloses a construction device for a concrete pipe pile. The construction device comprises a control machine body. A metal water tank, an operation control chamber and a rectangular block are fixedly connected to the upper surface of the control machine body. A rectangular opening is formed in the upper surface of the rectangular block, and a first metal shaft is fixedly connected to the inner wall of the rectangular opening. The invention further provides a construction method for the concrete pipe pile. The construction method for the concrete pipe pile comprises the followingsteps of S1, firstly opening a protective door to enter an operation control room, and starting equipment. According to the construction device for the concrete pipe pile, through the arrangement ofa first transmission rod, a second transmission rod, a third transmission rod and a pile cutting rack, multiple tools are not needed for auxiliary operation when the device is used for constructing the concrete pipe pile, manual auxiliary operation is reduced during construction, and potential safety hazards of accidents are reduced. The device has the advantages that auxiliary operation of the multiple tools is not needed, the construction operation difficulty is reduced for people, dangerous accidents can be reduced, and safety accidents are avoided.
本发明公开了一种混凝土管桩用施工装置,包括控制机身,所述控制机身的上表面分别固定连接有金属水箱、操作控制室和矩形块,所述矩形块的上表面开设有矩形口,且矩形口的内壁固定连接有第一金属轴;一种混凝土管桩用施方法,包括以下步骤;S1、首先打开防护门进入到操作控制室内部,启动该设备。该混凝土管桩用施工装置,通过设置第一传动杆、第二传动杆、第三传动杆和截桩机架能使该装置在进行混凝土管桩施工时不需要多个工具进行辅助操作,同时在施工时减少人工来辅助操作,减少事故的安全隐患,从而使该装置具有不需要多个工具辅助操作,减小人们施工操作难度的效果,同时能够减少危险事故发生,避免安全事故发生。
Construction device and method for concrete pipe pile
一种混凝土管桩用施工装置及方法
HUANG LIXIAN (author)
2020-10-02
Patent
Electronic Resource
Chinese
Prestressed concrete pipe pile construction device and method
European Patent Office | 2024
|Construction device for concrete pipe pile and construction method thereof
European Patent Office | 2024
|