A platform for research: civil engineering, architecture and urbanism
Construction method of cover-excavation method cladding system
The invention discloses a construction method of a cover-excavation method cladding system, and relates to the technical field of engineering construction. The invention discloses a construction method of a cover-excavation method cladding system. The construction method comprises the following steps of: prefabricating a cladding plate: designing the cladding plate as a plate-beam integrated fullsteel plate, and forming clamping grooves in the four corners of the lower end of the full steel plate; pouring a top frame; paving a frame main body; paving and constructing the cladding system; constructing the top of the cladding plate; clamping at least two of a side connecting rod, a middle connecting rod and a vertical installation rod in a connecting base main body to spice and form the frame main body, fixedly connecting the connecting base main body with a connecting beam by a fixed screw rod and a longitudinal beam on the top frame, clamping the prefabricated cladding plate with theframe main body, and finally pouring asphalt. According to the construction method of the cover-excavation method cladding system, the frame main body and the cladding plate can be reused, so the construction cost is reduced, and the construction period is relatively short; and the construction method is suitable for use in areas with high requirements for urban traffic environment.
本发明公开了一种盖挖法铺盖体系施工方法,涉及工程施工技术领域。本发明一种盖挖法铺盖体系施工方法,预制铺盖板:将铺盖板设计为板梁一体化的全钢板,其下端四角均开设有卡槽;浇筑顶部框架;铺设框架主体;铺盖板铺设施工;铺盖板顶部施工;将侧边连接杆、中部连接杆和纵向安装杆中的至少两个卡接在连接座主体内拼接形成框架主体,将连接座主体通过固定螺杆与顶部框架上的纵梁和连接梁固定连接,再将预制好的铺盖板与框架主体卡接在一起,最后最后浇筑沥青。本发明专利所述的一种盖挖法铺盖体系的施工方法,框架主体和铺盖板均可重复使用,降低了施工成本,且施工周期相对较短,适合在城市交通环境要求较高的区域使用。
Construction method of cover-excavation method cladding system
The invention discloses a construction method of a cover-excavation method cladding system, and relates to the technical field of engineering construction. The invention discloses a construction method of a cover-excavation method cladding system. The construction method comprises the following steps of: prefabricating a cladding plate: designing the cladding plate as a plate-beam integrated fullsteel plate, and forming clamping grooves in the four corners of the lower end of the full steel plate; pouring a top frame; paving a frame main body; paving and constructing the cladding system; constructing the top of the cladding plate; clamping at least two of a side connecting rod, a middle connecting rod and a vertical installation rod in a connecting base main body to spice and form the frame main body, fixedly connecting the connecting base main body with a connecting beam by a fixed screw rod and a longitudinal beam on the top frame, clamping the prefabricated cladding plate with theframe main body, and finally pouring asphalt. According to the construction method of the cover-excavation method cladding system, the frame main body and the cladding plate can be reused, so the construction cost is reduced, and the construction period is relatively short; and the construction method is suitable for use in areas with high requirements for urban traffic environment.
本发明公开了一种盖挖法铺盖体系施工方法,涉及工程施工技术领域。本发明一种盖挖法铺盖体系施工方法,预制铺盖板:将铺盖板设计为板梁一体化的全钢板,其下端四角均开设有卡槽;浇筑顶部框架;铺设框架主体;铺盖板铺设施工;铺盖板顶部施工;将侧边连接杆、中部连接杆和纵向安装杆中的至少两个卡接在连接座主体内拼接形成框架主体,将连接座主体通过固定螺杆与顶部框架上的纵梁和连接梁固定连接,再将预制好的铺盖板与框架主体卡接在一起,最后最后浇筑沥青。本发明专利所述的一种盖挖法铺盖体系的施工方法,框架主体和铺盖板均可重复使用,降低了施工成本,且施工周期相对较短,适合在城市交通环境要求较高的区域使用。
Construction method of cover-excavation method cladding system
一种盖挖法铺盖体系施工方法
ZHU BINGBING (author) / XU XINWEN (author) / FU LIXIANG (author) / WANG FUHUA (author) / LIU YUANLIN (author) / WAN LI (author)
2020-10-02
Patent
Electronic Resource
Chinese
Cover excavation construction fender post structure and construction method
European Patent Office | 2021
|Cover-excavation top-down construction device and construction method
European Patent Office | 2023
|European Patent Office | 2016
|Construction method of cover excavation and underground excavation combined subway station structure
European Patent Office | 2023
|Station foundation pit engineering cover excavation construction method
European Patent Office | 2021
|