A platform for research: civil engineering, architecture and urbanism
Fabricated steel structure building pipeline arrangement method
The invention discloses an assembly type steel structure building pipeline arrangement method. The method comprises the following steps that a building structure diagram and a pipeline trend profile diagram are obtained; obtaining an initial three-dimensional model diagram corresponding to the building structure diagram and the pipeline trend profile diagram; and in the initial three-dimensional model graph, obtaining an area, needing to be optimized, of pipeline routing in the steel beam and/or the foundation wall. And in the selected area, adjusting and optimizing the pipeline arrangement and/or the position of the foundation wall according to an optimization rule. And outputting a construction drawing according to the optimized three-dimensional model drawing. Through a three-dimensional modeling mode, pipeline routing is subjected to system design optimization in a three-dimensional model diagram, so that problems are intercepted in a design stage, and the building quality and efficiency are improved.
本发明公开了一种装配式钢结构建筑管线布置方法,所述方法包括如下步骤:获取建筑结构图和管线走向剖面图。获取建筑结构图和管线走向剖面图对应的初始三维模型图。在所述初始三维模型图中,获取在钢梁和/或基墙中的管线走线需要优化的区域。在选取的区域中,根据优化规则对管线排布和/或基墙的位置进行调整优化。根据优化后的三维模型图,输出施工图纸。通过三维建模方式,将管线走线在三维模型图中进行系统设计优化,从而将问题拦截在设计阶段,以提升建筑质量和效率。
Fabricated steel structure building pipeline arrangement method
The invention discloses an assembly type steel structure building pipeline arrangement method. The method comprises the following steps that a building structure diagram and a pipeline trend profile diagram are obtained; obtaining an initial three-dimensional model diagram corresponding to the building structure diagram and the pipeline trend profile diagram; and in the initial three-dimensional model graph, obtaining an area, needing to be optimized, of pipeline routing in the steel beam and/or the foundation wall. And in the selected area, adjusting and optimizing the pipeline arrangement and/or the position of the foundation wall according to an optimization rule. And outputting a construction drawing according to the optimized three-dimensional model drawing. Through a three-dimensional modeling mode, pipeline routing is subjected to system design optimization in a three-dimensional model diagram, so that problems are intercepted in a design stage, and the building quality and efficiency are improved.
本发明公开了一种装配式钢结构建筑管线布置方法,所述方法包括如下步骤:获取建筑结构图和管线走向剖面图。获取建筑结构图和管线走向剖面图对应的初始三维模型图。在所述初始三维模型图中,获取在钢梁和/或基墙中的管线走线需要优化的区域。在选取的区域中,根据优化规则对管线排布和/或基墙的位置进行调整优化。根据优化后的三维模型图,输出施工图纸。通过三维建模方式,将管线走线在三维模型图中进行系统设计优化,从而将问题拦截在设计阶段,以提升建筑质量和效率。
Fabricated steel structure building pipeline arrangement method
装配式钢结构建筑管线布置方法
DAI LIXIAN (author) / ZHANG YAOLIN (author) / ZHOU YU (author) / XU HANG (author) / ZHU DEQIAO (author) / LI XIAO (author) / SUN YI (author) / ZHU PAI (author) / YAN XIAOXIA (author)
2020-10-02
Patent
Electronic Resource
Chinese
IPC:
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
E04G
SCAFFOLDING
,
Baugerüste
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Electrical pipeline arrangement structure of fabricated concrete building
European Patent Office | 2023
|Fabricated building pipeline arrangement construction process
European Patent Office | 2024
|Garbage well pipeline for fabricated steel structure building
European Patent Office | 2020
|Steel structure fabricated building assembly and steel structure fabricated building
European Patent Office | 2023
|Fabricated steel structure building assembly and fabricated building
European Patent Office | 2023
|