Fabricated building pipeline arrangement construction process
The invention discloses an assembly type building pipeline arrangement construction technology, and relates to the technical field of pipeline construction, the construction technology comprises the following steps: 1, digging a groove needed for arranging a pipeline on the ground, determining the position and the trend of the pipeline according to a design drawing, and carrying out marking and wiring; 2, a base is poured in the groove, and then prepared pipelines are sequentially arranged in the groove according to the requirements of a drawing; 3, two adjacent pipelines are connected to the top of the base through a fixing frame, then the pipelines are sealed, and it is guaranteed that no water leaks from the connecting positions of the pipelines; the fixing plate is inserted into the fixing grooves, meanwhile, one side of the bottom of the U-shaped plate is inserted into the clamping groove, so that the fixing plate is fixed in the fixing grooves, fixing of the transverse pipelines is achieved, and due to the fact that the multiple fixing grooves are formed, the installation distance between every two adjacent transverse pipelines can be conveniently adjusted.
本发明公开了一种装配式建筑管道布管施工工艺,涉及管道施工技术领域,该施工工艺包括以下步骤:步骤一:在地面上开挖出布置管道所需的沟槽,根据设计图纸,确定管道的位置和走向,并进行标线和布线;步骤二:在沟槽中浇注底座,然后依次将准备好的管道按照图纸的要求排布在沟槽内;步骤三:将相邻两个管道通过固定架连接在底座的顶部,然后对管道进行密封处理,确保管道连接处无漏水;通过使得固定板插入固定槽中,同时使得U形板的底部一侧插入卡槽中,从而使得固定板固定在固定槽中,从而实现对横向管道的固定,由于固定槽设置有多个,方便实现对相邻两个横向管道之间安装距离的调节。
Fabricated building pipeline arrangement construction process
The invention discloses an assembly type building pipeline arrangement construction technology, and relates to the technical field of pipeline construction, the construction technology comprises the following steps: 1, digging a groove needed for arranging a pipeline on the ground, determining the position and the trend of the pipeline according to a design drawing, and carrying out marking and wiring; 2, a base is poured in the groove, and then prepared pipelines are sequentially arranged in the groove according to the requirements of a drawing; 3, two adjacent pipelines are connected to the top of the base through a fixing frame, then the pipelines are sealed, and it is guaranteed that no water leaks from the connecting positions of the pipelines; the fixing plate is inserted into the fixing grooves, meanwhile, one side of the bottom of the U-shaped plate is inserted into the clamping groove, so that the fixing plate is fixed in the fixing grooves, fixing of the transverse pipelines is achieved, and due to the fact that the multiple fixing grooves are formed, the installation distance between every two adjacent transverse pipelines can be conveniently adjusted.
本发明公开了一种装配式建筑管道布管施工工艺,涉及管道施工技术领域,该施工工艺包括以下步骤:步骤一:在地面上开挖出布置管道所需的沟槽,根据设计图纸,确定管道的位置和走向,并进行标线和布线;步骤二:在沟槽中浇注底座,然后依次将准备好的管道按照图纸的要求排布在沟槽内;步骤三:将相邻两个管道通过固定架连接在底座的顶部,然后对管道进行密封处理,确保管道连接处无漏水;通过使得固定板插入固定槽中,同时使得U形板的底部一侧插入卡槽中,从而使得固定板固定在固定槽中,从而实现对横向管道的固定,由于固定槽设置有多个,方便实现对相邻两个横向管道之间安装距离的调节。
Fabricated building pipeline arrangement construction process
一种装配式建筑管道布管施工工艺
LIU DAOBIN (author) / TANG LINSEN (author) / ZHU LIEMIN (author) / ZHANG XIANG (author) / XIE YONGYI (author)
2024-03-29
Patent
Electronic Resource
Chinese
Fabricated steel structure building pipeline arrangement method
European Patent Office | 2020
|Electrical pipeline arrangement structure of fabricated concrete building
European Patent Office | 2023
|Fabricated building fire-fighting pipeline construction device and method
European Patent Office | 2024
|Novel pipeline form hoisting process for fabricated building
European Patent Office | 2021
|