Cast-in-situ bored pile construction method
The invention provides a cast-in-situ bored pile construction method, and belongs to the technical field of cast-in-situ bored pile construction. The method comprises the steps that a pile casing is buried in a pile position on the ground, and part of the pile casing is exposed out of the ground; drilling is carried out to form a hole; a hole is drilled in the soil layer in the pile casing to forma pile hole, and mud is injected into the pile casing during drilling; the mud is prepared from water, clay, bentonite and a copolymer filtrate reduction reagent, and the mass ratio of the water to the clay to the bentonite to the copolymer filtrate reduction reagent is (0.9-1) : (0.3-0.5) : (0.07-0.09) : (0.005-0.015); a reinforcement cage is placed in the pile hole; and concrete is poured intothe pile hole to the preset height to form the cast-in-situ bored pile. Chemical mud is adopted for wall protection construction of sand soil, the self-supporting strength of the hole wall of the pilehole can be enhanced, the wall protection effect is improved, and the hole collapse probability is effectively reduced.
本发明提供一种钻孔灌注桩施工方法,属于钻孔灌注桩施工技术领域,所述方法包括:在地面的桩位埋设护筒,所述护筒的部分露出地面;钻进成孔:向所述护筒内的土层钻孔以形成桩孔,钻孔时向所述护筒内注入泥浆;其中,所述泥浆包括水、粘土、膨润土和共聚物降滤试剂,且所述水、所述粘土、所述膨润土和所述共聚物降滤试剂的质量比为(0.9~1):(0.3~0.5):(0.07~0.09):(0.005~0.015);向所述桩孔内放置钢筋笼;向所述桩孔内浇筑混凝土至预设高度以形成钻孔灌注桩。采用化学泥浆进行砂类土的护壁施工,能增强桩孔孔壁的自立强度,增加护壁效果,有效降低塌孔几率。
Cast-in-situ bored pile construction method
The invention provides a cast-in-situ bored pile construction method, and belongs to the technical field of cast-in-situ bored pile construction. The method comprises the steps that a pile casing is buried in a pile position on the ground, and part of the pile casing is exposed out of the ground; drilling is carried out to form a hole; a hole is drilled in the soil layer in the pile casing to forma pile hole, and mud is injected into the pile casing during drilling; the mud is prepared from water, clay, bentonite and a copolymer filtrate reduction reagent, and the mass ratio of the water to the clay to the bentonite to the copolymer filtrate reduction reagent is (0.9-1) : (0.3-0.5) : (0.07-0.09) : (0.005-0.015); a reinforcement cage is placed in the pile hole; and concrete is poured intothe pile hole to the preset height to form the cast-in-situ bored pile. Chemical mud is adopted for wall protection construction of sand soil, the self-supporting strength of the hole wall of the pilehole can be enhanced, the wall protection effect is improved, and the hole collapse probability is effectively reduced.
本发明提供一种钻孔灌注桩施工方法,属于钻孔灌注桩施工技术领域,所述方法包括:在地面的桩位埋设护筒,所述护筒的部分露出地面;钻进成孔:向所述护筒内的土层钻孔以形成桩孔,钻孔时向所述护筒内注入泥浆;其中,所述泥浆包括水、粘土、膨润土和共聚物降滤试剂,且所述水、所述粘土、所述膨润土和所述共聚物降滤试剂的质量比为(0.9~1):(0.3~0.5):(0.07~0.09):(0.005~0.015);向所述桩孔内放置钢筋笼;向所述桩孔内浇筑混凝土至预设高度以形成钻孔灌注桩。采用化学泥浆进行砂类土的护壁施工,能增强桩孔孔壁的自立强度,增加护壁效果,有效降低塌孔几率。
Cast-in-situ bored pile construction method
一种钻孔灌注桩施工方法
GULIZAILA AIMAIERJIANG (author) / CHEN YUNZE (author) / YANG FAN (author) / WEI HONGGANG (author) / YANG ZHIGANG (author) / GAO RUNBAO (author) / MENG SHUHAO (author) / YANG BILIANG (author) / BIAN YUBAO (author)
2020-10-13
Patent
Electronic Resource
Chinese