A platform for research: civil engineering, architecture and urbanism
Concrete prefabricating grouting sealing assembly inspection well
One or more embodiments of the invention provide a concrete prefabricating grouting sealing assembly inspection well which comprises a bottom plate, side vertical plates and a cover plate. The concrete prefabricating grouting sealing assembly inspection well is characterized in that bottom flanges are arranged on the periphery of the top of the bottom plate, and bottom inner chamfers are arrangedon the inner sides of the bottom flanges; the side vertical plates are located above the bottom plate, bottom grooves are formed in the lower ends of the side vertical plates, and grouting through holes are formed in the corners of the lower sides of the side vertical plates; and the cover plate is located above the side vertical plates. Due to the fact that the inspection well is overall dividedinto the bottom plate, the side vertical plates, the cover plate and multiple independent concrete prefabricated parts, the parts of the inspection well can be spliced and connected through arranged embedded grooves and connecting structures which are matched, meanwhile, clearances are reserved in the middles of the embedded concave-convex groove structures to form grouting channels, the parts canform net-shaped connecting structures through pouring of the grouting channels so as to be connected into a whole, and therefore the stability and sealing performance of the overall structure of theinspection well are ensured.
本说明书一个或多个实施例提供一种混凝土预制灌浆密封装配式检查井,底板、侧立板及盖板,其特征在于:所述底板的顶部四周设置有底部凸缘,所述底部凸缘的内侧设置有底部内倒角;所述侧立板位于所述底板的上方,所述侧立板的下端设置有底部凹槽,所述侧立板的下侧边角处设置有注浆通孔;所述盖板位于所述侧立板的上方。本发明通过将检查井整体分为底板、侧立板及盖板多个独立的混凝土预制件,检查井的每块分件之间可以通过设置的相互配合的嵌合槽和连接结构进行拼合连接,同时嵌合凹凸槽结构中间预留有空隙以构成灌浆通道,使分件之间可以通过灌浆通道灌浆构成网状连接结构以相连成为整体,从而保证检查井整体结构的稳固性和密封性。
Concrete prefabricating grouting sealing assembly inspection well
One or more embodiments of the invention provide a concrete prefabricating grouting sealing assembly inspection well which comprises a bottom plate, side vertical plates and a cover plate. The concrete prefabricating grouting sealing assembly inspection well is characterized in that bottom flanges are arranged on the periphery of the top of the bottom plate, and bottom inner chamfers are arrangedon the inner sides of the bottom flanges; the side vertical plates are located above the bottom plate, bottom grooves are formed in the lower ends of the side vertical plates, and grouting through holes are formed in the corners of the lower sides of the side vertical plates; and the cover plate is located above the side vertical plates. Due to the fact that the inspection well is overall dividedinto the bottom plate, the side vertical plates, the cover plate and multiple independent concrete prefabricated parts, the parts of the inspection well can be spliced and connected through arranged embedded grooves and connecting structures which are matched, meanwhile, clearances are reserved in the middles of the embedded concave-convex groove structures to form grouting channels, the parts canform net-shaped connecting structures through pouring of the grouting channels so as to be connected into a whole, and therefore the stability and sealing performance of the overall structure of theinspection well are ensured.
本说明书一个或多个实施例提供一种混凝土预制灌浆密封装配式检查井,底板、侧立板及盖板,其特征在于:所述底板的顶部四周设置有底部凸缘,所述底部凸缘的内侧设置有底部内倒角;所述侧立板位于所述底板的上方,所述侧立板的下端设置有底部凹槽,所述侧立板的下侧边角处设置有注浆通孔;所述盖板位于所述侧立板的上方。本发明通过将检查井整体分为底板、侧立板及盖板多个独立的混凝土预制件,检查井的每块分件之间可以通过设置的相互配合的嵌合槽和连接结构进行拼合连接,同时嵌合凹凸槽结构中间预留有空隙以构成灌浆通道,使分件之间可以通过灌浆通道灌浆构成网状连接结构以相连成为整体,从而保证检查井整体结构的稳固性和密封性。
Concrete prefabricating grouting sealing assembly inspection well
一种混凝土预制灌浆密封装配式检查井
HAN ZIHUI (author) / CHANG ZHIGANG (author)
2020-10-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Grouting equipment for prefabricating assembly type concrete wallboard
European Patent Office | 2024
|Inspection well prefabricating mold and application method thereof
European Patent Office | 2021
|Pile end combined compaction grouting construction method for prefabricating solid pile
European Patent Office | 2023
|European Patent Office | 2022
|Municipal sewage well wall prefabricating and assembling process and concrete well wall component
European Patent Office | 2021
|