A platform for research: civil engineering, architecture and urbanism
Lifting equipment
The invention discloses lifting equipment. The lifting equipment comprises a crane, a transport trolley and a main hanging carrying pole, wherein the transport trolley comprises a transport support and a plurality of wheels; the main hanging carrying pole comprises a main hanging steel plate, and a plurality of first lifting holes used for the wire rope mounting of the crane are respectively formed in the two ends of the main hanging steel plate; and second lifting holes used for lifting a steel reinforcement cage are formed in the main hanging steel plate along the self length. The transporttrolley is adopted to solve the problem of steel reinforcement cage transport in and out of a field, and the crane lifts the segmented steel reinforcement cage to vertically put into a groove throughthe main hanging carrying pole. The transport trolley and the main hanging carrying pole are utilized to solve the problem that the steel reinforcement cage is transferred and lifted in limited space,so construction manpower material resources and time limit are saved. The lifting equipment can be widely applied to the technical field of building construction.
本发明公开了一种起吊设备,其包括吊机、运输台车以及主吊扁担,运输台车包括运输支架和多个车轮;主吊扁担包括主吊钢板,主吊钢板的两端分别设置有多个用于与吊机的钢丝绳安装的第一吊装孔,主吊钢板沿自身长度设置有多个用于吊起钢筋笼的第二吊装孔。采用运输台车解决钢筋笼在场地内外的运输问题,吊机通过主吊扁担将分节后钢筋笼吊起竖直入槽。利用运输台车和主吊扁担解决了在有限场地空间转运吊装钢筋笼的问题,节省施工的人力、物力和工期。本发明可广泛应用于建筑施工技术领域。
Lifting equipment
The invention discloses lifting equipment. The lifting equipment comprises a crane, a transport trolley and a main hanging carrying pole, wherein the transport trolley comprises a transport support and a plurality of wheels; the main hanging carrying pole comprises a main hanging steel plate, and a plurality of first lifting holes used for the wire rope mounting of the crane are respectively formed in the two ends of the main hanging steel plate; and second lifting holes used for lifting a steel reinforcement cage are formed in the main hanging steel plate along the self length. The transporttrolley is adopted to solve the problem of steel reinforcement cage transport in and out of a field, and the crane lifts the segmented steel reinforcement cage to vertically put into a groove throughthe main hanging carrying pole. The transport trolley and the main hanging carrying pole are utilized to solve the problem that the steel reinforcement cage is transferred and lifted in limited space,so construction manpower material resources and time limit are saved. The lifting equipment can be widely applied to the technical field of building construction.
本发明公开了一种起吊设备,其包括吊机、运输台车以及主吊扁担,运输台车包括运输支架和多个车轮;主吊扁担包括主吊钢板,主吊钢板的两端分别设置有多个用于与吊机的钢丝绳安装的第一吊装孔,主吊钢板沿自身长度设置有多个用于吊起钢筋笼的第二吊装孔。采用运输台车解决钢筋笼在场地内外的运输问题,吊机通过主吊扁担将分节后钢筋笼吊起竖直入槽。利用运输台车和主吊扁担解决了在有限场地空间转运吊装钢筋笼的问题,节省施工的人力、物力和工期。本发明可广泛应用于建筑施工技术领域。
Lifting equipment
一种起吊设备
LI JIAHONG (author) / WANG QINGWEI (author) / REN TAO (author) / LUO BIN (author) / HE HUIHUI (author) / ZHANG QI (author)
2020-10-27
Patent
Electronic Resource
Chinese