The invention provides a construction process for a road with a piping shaft. The process comprises the steps of roadbed excavation and cleaning, base layer laying, base layer shaping, concrete pouring and cement concrete surface layer construction. Before concrete pouring construction, the piping shaft suite is prefabricated in a factory, the side edge of the piping shaft suite is a straight plane, the prefabricated piping shaft suite is connected to the exterior of a piping shaft in a sleeving mode, the upper surface of the piping shaft suite is flush with the piping shaft as much as possible, concrete pouring is conducted after the piping shaft suite is connected in the sleeving mode, and then normal cement concrete surface layer construction is conducted. In the construction of the road provided with the piping shaft, the prefabricated square piping shaft suite is connected to the exterior of the piping shaft in a sleeving mode, then concrete pouring operation is conducted, and therefore concrete around the piping shaft can be vibrated more conveniently and rapidly, no trace is left, and the road surface is smoother.
本发明提供一种具有管道井道路施工工艺,包括路基挖掘清理、铺设基层、基层整形、浇筑混凝土、水泥砼面层施工,在浇筑混凝土施工之前在工厂预制管道井套件,管道井套件侧边为直平面,将预制的管道井套件套接在管道井外,并使管道井套件上表面尽量与管道井齐平,管道井套件套接好后进行浇筑混凝土,然后进行正常的水泥砼面层施工。本发明通过在设有管道井的道路施工中先将预制的方形的管道井套件套接在管道井外,再进行浇筑混凝土作业,这样在管道井周边的混凝土振捣时更加方便、快捷,不会留下痕迹,使路面更加光滑。
Construction process for road with piping shaft
The invention provides a construction process for a road with a piping shaft. The process comprises the steps of roadbed excavation and cleaning, base layer laying, base layer shaping, concrete pouring and cement concrete surface layer construction. Before concrete pouring construction, the piping shaft suite is prefabricated in a factory, the side edge of the piping shaft suite is a straight plane, the prefabricated piping shaft suite is connected to the exterior of a piping shaft in a sleeving mode, the upper surface of the piping shaft suite is flush with the piping shaft as much as possible, concrete pouring is conducted after the piping shaft suite is connected in the sleeving mode, and then normal cement concrete surface layer construction is conducted. In the construction of the road provided with the piping shaft, the prefabricated square piping shaft suite is connected to the exterior of the piping shaft in a sleeving mode, then concrete pouring operation is conducted, and therefore concrete around the piping shaft can be vibrated more conveniently and rapidly, no trace is left, and the road surface is smoother.
本发明提供一种具有管道井道路施工工艺,包括路基挖掘清理、铺设基层、基层整形、浇筑混凝土、水泥砼面层施工,在浇筑混凝土施工之前在工厂预制管道井套件,管道井套件侧边为直平面,将预制的管道井套件套接在管道井外,并使管道井套件上表面尽量与管道井齐平,管道井套件套接好后进行浇筑混凝土,然后进行正常的水泥砼面层施工。本发明通过在设有管道井的道路施工中先将预制的方形的管道井套件套接在管道井外,再进行浇筑混凝土作业,这样在管道井周边的混凝土振捣时更加方便、快捷,不会留下痕迹,使路面更加光滑。
Construction process for road with piping shaft
一种具有管道井道路施工工艺
HAN XIAOYU (author) / LIU TIANJIAO (author)
2020-10-27
Patent
Electronic Resource
Chinese
Piping shaft manufacturing formwork and industrialized piping shaft production method
European Patent Office | 2015
|BIM (Building Information Modeling)-based piping shaft installation construction method
European Patent Office | 2022
|