Giant stone blocked road rush-repair method
The invention discloses a giant stone blocked road rush-repair method. The method comprises the following steps that S1, retaining walls are built on outer sides of giant stones on an original road surface, the retaining walls are distributed in a triangular shape along the longitudinal direction of the original road surface, and the giant stones are arranged at a center of a triangle; S2, after the retaining walls are piled up, soil and stone are backfilled for the first time on one side of the giant stones on the inner side of the retaining walls to form a first backfill soil area, soil andstone are backfilled for the second time on the other side of the giant stones to form a second backfill soil area after first soil and stone backfill is completed, and the first backfill soil area, the second backfill soil area and the tops of the giant stones form a heavy machine road; and S3, third soil and stone backfill is performed on the heavy machine road to form a third backfill soil area, and the third backfill soil area and the top of the giant stones form a common vehicle passage shortcut. According to the rush-repair method, the giant stones blocking the road serve as a roadbed, and a new road surface is formed through soil filling construction so that vehicles can pass smoothly.
本发明公开了一种巨石堵塞道路抢通方法,包括以下步骤:S1、在原路面上巨石的外侧码砌挡墙,所述挡墙沿原路面纵向呈三角形分布,所述巨石布置在三角形的中心处;S2、挡墙码砌完成后,在挡墙内侧巨石的一侧进行第一次回填土石形成第一次回填土区,第一次回填土石完成后,在巨石的另一侧进行第二次回填土石形成第二次回填土区,所述第一次回填土区、第二次回填土区和巨石的顶部构成重机路;S3、在重机路上进行第三次回填土石形成第三次回填土区,所述第三次回填土区和巨石的顶部构成普通车通行便道。本发明所述抢通方法以堵塞道路的巨石为道路路基,填土施工形成新路面让车辆顺利通行。
Giant stone blocked road rush-repair method
The invention discloses a giant stone blocked road rush-repair method. The method comprises the following steps that S1, retaining walls are built on outer sides of giant stones on an original road surface, the retaining walls are distributed in a triangular shape along the longitudinal direction of the original road surface, and the giant stones are arranged at a center of a triangle; S2, after the retaining walls are piled up, soil and stone are backfilled for the first time on one side of the giant stones on the inner side of the retaining walls to form a first backfill soil area, soil andstone are backfilled for the second time on the other side of the giant stones to form a second backfill soil area after first soil and stone backfill is completed, and the first backfill soil area, the second backfill soil area and the tops of the giant stones form a heavy machine road; and S3, third soil and stone backfill is performed on the heavy machine road to form a third backfill soil area, and the third backfill soil area and the top of the giant stones form a common vehicle passage shortcut. According to the rush-repair method, the giant stones blocking the road serve as a roadbed, and a new road surface is formed through soil filling construction so that vehicles can pass smoothly.
本发明公开了一种巨石堵塞道路抢通方法,包括以下步骤:S1、在原路面上巨石的外侧码砌挡墙,所述挡墙沿原路面纵向呈三角形分布,所述巨石布置在三角形的中心处;S2、挡墙码砌完成后,在挡墙内侧巨石的一侧进行第一次回填土石形成第一次回填土区,第一次回填土石完成后,在巨石的另一侧进行第二次回填土石形成第二次回填土区,所述第一次回填土区、第二次回填土区和巨石的顶部构成重机路;S3、在重机路上进行第三次回填土石形成第三次回填土区,所述第三次回填土区和巨石的顶部构成普通车通行便道。本发明所述抢通方法以堵塞道路的巨石为道路路基,填土施工形成新路面让车辆顺利通行。
Giant stone blocked road rush-repair method
一种巨石堵塞道路抢通方法
ZHANG SHENG (author) / YUAN SONG (author) / SHAO LIN (author) / WANG XIBAO (author) / ZHOU KE (author)
2020-10-30
Patent
Electronic Resource
Chinese
Design and Experiment on the Road Pavement for Rush to Repair
Trans Tech Publications | 2014
|