A platform for research: civil engineering, architecture and urbanism
Oil seepage prevention ground structure and construction method thereof
The invention relates to the technical field of oil seepage prevention ground construction, in particular to an oil seepage prevention ground structure and a construction method thereof. The oil seepage prevention ground structure comprises a base layer, a leveling layer, an oil seepage prevention cement gum layer and an oil seepage prevention concrete layer, wherein the leveling layer is arrangedat the top end of the base layer and fixedly connected with the base layer, the oil seepage prevention cement gum layer is arranged at the top end of the leveling layer and fixedly connected with theleveling layer, the oil seepage prevention concrete layer is arranged at the top end of the oil seepage prevention cement gum layer and fixedly connected with the oil seepage prevention cement gum layer, and an anti-crack mesh is horizontally arranged in the oil seepage prevention concrete layer. The oil seepage prevention ground structure and the construction method thereof has the effect of improving the anti-cracking performance of the oil seepage resistant concrete.
本申请涉及防油渗地面施工的技术领域,尤其是涉及一种防油渗地面结构以及其施工方法,其包括基层、找平层、防油渗胶泥层和防油渗混凝土层,找平层设置在基层的顶端,找平层与基层固定连接,防油渗胶泥层设置在找平层的顶端,防油渗胶泥层与找平层固定连接,防油渗混凝土层设置在防油渗胶泥层的顶端,防油渗混凝土层与防油渗胶泥层固定连接,防油渗混凝土层内水平设置有抗裂网片。本申请具有提升抗油渗混凝土的抗裂性能的效果。
Oil seepage prevention ground structure and construction method thereof
The invention relates to the technical field of oil seepage prevention ground construction, in particular to an oil seepage prevention ground structure and a construction method thereof. The oil seepage prevention ground structure comprises a base layer, a leveling layer, an oil seepage prevention cement gum layer and an oil seepage prevention concrete layer, wherein the leveling layer is arrangedat the top end of the base layer and fixedly connected with the base layer, the oil seepage prevention cement gum layer is arranged at the top end of the leveling layer and fixedly connected with theleveling layer, the oil seepage prevention concrete layer is arranged at the top end of the oil seepage prevention cement gum layer and fixedly connected with the oil seepage prevention cement gum layer, and an anti-crack mesh is horizontally arranged in the oil seepage prevention concrete layer. The oil seepage prevention ground structure and the construction method thereof has the effect of improving the anti-cracking performance of the oil seepage resistant concrete.
本申请涉及防油渗地面施工的技术领域,尤其是涉及一种防油渗地面结构以及其施工方法,其包括基层、找平层、防油渗胶泥层和防油渗混凝土层,找平层设置在基层的顶端,找平层与基层固定连接,防油渗胶泥层设置在找平层的顶端,防油渗胶泥层与找平层固定连接,防油渗混凝土层设置在防油渗胶泥层的顶端,防油渗混凝土层与防油渗胶泥层固定连接,防油渗混凝土层内水平设置有抗裂网片。本申请具有提升抗油渗混凝土的抗裂性能的效果。
Oil seepage prevention ground structure and construction method thereof
一种防油渗地面结构以及其施工方法
ZHANG XIANGHUA (author) / WANG MIAO (author)
2020-10-30
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
European Patent Office | 2023
|European Patent Office | 2022
|European Patent Office | 2022
|Building roof heat preservation and seepage prevention structure and construction method thereof
European Patent Office | 2024
|