A platform for research: civil engineering, architecture and urbanism
Rapid construction cutting retaining wall and construction method thereof
The invention discloses a rapid construction cutting retaining wall and a construction method thereof. The rapid construction cutting retaining wall comprises at least two gabion stone cages, a waterdrain pipe, anti-seepage geotechnical cloth and a wall top waterproof backfill layer; the gabion stone cages are uniformly piled at a cutting slope and are sequentially arranged upwards along the toeof the cutting slope; a drain hole is formed in the piled gabion stone cages, one end of the water drain pipe is connected with the drain hole, and the other end of the water drain pipe extends alongthe outer sides of the gabion stone cages; and the anti-seepage geotechnical cloth is arranged below the drain hole, and a water-resisting layer is further arranged below the anti-seepage geotechnicalcloth. The problems that in conventional retaining wall construction, a wall body is poured by erecting a formwork front and back, then wall back backfilling is carried out, and consequently backfilling construction is difficult are solved, the construction procedures are reduced, the construction period is greatly shortened, meanwhile, a gabion stone cage assembly can be self-stabilized, and a certain supporting and blocking effect on a side slope is achieved.
本发明公开了一种快速施工路堑挡墙及其施工方法,包括至少两个格宾石笼、泄水管、防渗土工布和墙顶隔水回填层;所述格宾石笼均匀码砌在路堑边坡处,且沿着路堑边坡坡脚处依次往上设置;所述码砌好的格宾石笼上设置泄水孔,所述泄水管的一端与所述泄水孔连接,另一端沿所述格宾石笼外侧延伸;所述防渗土工布设置在所述泄水孔下方,且所述防渗土工布下方还设置有隔水层;解决了常规挡墙施工先前后立模浇筑墙身,后填筑墙背回填施工困难的问题,减少了施工工序,大大缩短了工期,同时格宾石笼组合体能够自稳,对边坡也有一定的支挡作用。
Rapid construction cutting retaining wall and construction method thereof
The invention discloses a rapid construction cutting retaining wall and a construction method thereof. The rapid construction cutting retaining wall comprises at least two gabion stone cages, a waterdrain pipe, anti-seepage geotechnical cloth and a wall top waterproof backfill layer; the gabion stone cages are uniformly piled at a cutting slope and are sequentially arranged upwards along the toeof the cutting slope; a drain hole is formed in the piled gabion stone cages, one end of the water drain pipe is connected with the drain hole, and the other end of the water drain pipe extends alongthe outer sides of the gabion stone cages; and the anti-seepage geotechnical cloth is arranged below the drain hole, and a water-resisting layer is further arranged below the anti-seepage geotechnicalcloth. The problems that in conventional retaining wall construction, a wall body is poured by erecting a formwork front and back, then wall back backfilling is carried out, and consequently backfilling construction is difficult are solved, the construction procedures are reduced, the construction period is greatly shortened, meanwhile, a gabion stone cage assembly can be self-stabilized, and a certain supporting and blocking effect on a side slope is achieved.
本发明公开了一种快速施工路堑挡墙及其施工方法,包括至少两个格宾石笼、泄水管、防渗土工布和墙顶隔水回填层;所述格宾石笼均匀码砌在路堑边坡处,且沿着路堑边坡坡脚处依次往上设置;所述码砌好的格宾石笼上设置泄水孔,所述泄水管的一端与所述泄水孔连接,另一端沿所述格宾石笼外侧延伸;所述防渗土工布设置在所述泄水孔下方,且所述防渗土工布下方还设置有隔水层;解决了常规挡墙施工先前后立模浇筑墙身,后填筑墙背回填施工困难的问题,减少了施工工序,大大缩短了工期,同时格宾石笼组合体能够自稳,对边坡也有一定的支挡作用。
Rapid construction cutting retaining wall and construction method thereof
一种快速施工路堑挡墙及其施工方法
SHAO LIN (author) / WANG XIBAO (author) / YUAN SONG (author) / ZHANG SHENG (author)
2020-11-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cutting retaining wall structure and construction method
European Patent Office | 2025
|European Patent Office | 2023
|European Patent Office | 2024
|