A platform for research: civil engineering, architecture and urbanism
The invention discloses a hanging structure for a concrete beam. The hanging structure for the concrete beam comprises the concrete beam, a top plate, connecting plates, a bottom plate and a hanging piece; the top plate is arranged on the top face of the concrete beam, the connecting plates are arranged on the two opposite side faces of the concrete beam in the width direction, and one ends of theconnecting plates in the length directions of the connecting plates are connected with the top plate; and the bottom plate is connected with the connecting plates, located below the concrete beam andused for bearing loads and transmitting the loads to the top plate through the connecting plates, and the hanging piece is connected with the bottom plate. According to the hanging structure for theconcrete beam, the maximum load allowed to be hung by the hanging structure for the concrete beam is effectively increased, and the numerical value of the maximum load allowed to be hung by the hanging structure can be accurately calculated, so that the potential safety hazard that the concrete beam is damaged due to overlarge stress is eliminated.
本发明公开了一种混凝土梁的吊挂结构,所述混凝土梁的吊挂结构包括混凝土梁、顶板、连接板、底板和吊挂件,所述顶板设在所述混凝土梁的顶面,所述连接板设在所述混凝土梁的宽度方向上相对的两侧面,所述连接板在其长度方向上的一端与所述顶板连接;所述底板与所述连接板相连且位于所述混凝土梁下方,用于承受荷载并将荷载通过连接板传递至所述顶板,所述吊挂件与所述底板连接。本发明有效增加了混凝土梁吊挂结构允许吊挂的最大载荷,并且可以精确计算出吊挂结构允许吊挂的最大荷载的数值,消除了混凝土梁受力过大被破坏的安全隐患。
The invention discloses a hanging structure for a concrete beam. The hanging structure for the concrete beam comprises the concrete beam, a top plate, connecting plates, a bottom plate and a hanging piece; the top plate is arranged on the top face of the concrete beam, the connecting plates are arranged on the two opposite side faces of the concrete beam in the width direction, and one ends of theconnecting plates in the length directions of the connecting plates are connected with the top plate; and the bottom plate is connected with the connecting plates, located below the concrete beam andused for bearing loads and transmitting the loads to the top plate through the connecting plates, and the hanging piece is connected with the bottom plate. According to the hanging structure for theconcrete beam, the maximum load allowed to be hung by the hanging structure for the concrete beam is effectively increased, and the numerical value of the maximum load allowed to be hung by the hanging structure can be accurately calculated, so that the potential safety hazard that the concrete beam is damaged due to overlarge stress is eliminated.
本发明公开了一种混凝土梁的吊挂结构,所述混凝土梁的吊挂结构包括混凝土梁、顶板、连接板、底板和吊挂件,所述顶板设在所述混凝土梁的顶面,所述连接板设在所述混凝土梁的宽度方向上相对的两侧面,所述连接板在其长度方向上的一端与所述顶板连接;所述底板与所述连接板相连且位于所述混凝土梁下方,用于承受荷载并将荷载通过连接板传递至所述顶板,所述吊挂件与所述底板连接。本发明有效增加了混凝土梁吊挂结构允许吊挂的最大载荷,并且可以精确计算出吊挂结构允许吊挂的最大荷载的数值,消除了混凝土梁受力过大被破坏的安全隐患。
Hanging structure for concrete beam and construction method of hanging structure
混凝土梁的吊挂结构及其施工方法
SUN YAMIN (author)
2020-11-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete hanging basket for concrete hanging wall construction
European Patent Office | 2024
|Construction hanging basket structure and hanging basket moving method
European Patent Office | 2024
|European Patent Office | 2024
|Stone dry hanging structure and stone dry hanging construction method
European Patent Office | 2021
|Construction method of concrete inverted hanging type structure
European Patent Office | 2024
|