A platform for research: civil engineering, architecture and urbanism
Lowering device for sea area bearing platform pile foundation reinforcement cage
The invention discloses a lowering device for a sea area bearing platform pile foundation reinforcement cage. The device comprises supporting I-beams arranged above a bearing platform steel hanging box, connecting I-beams welded between the supporting I-beams, vertical supporting I-beams above the supporting I-beams, a connecting system between the vertical supporting I-beams, and a walkway structure and an elevator cage arranged above the vertical supporting I-beams, wherein a protective net is arranged on the periphery of the walkway structure. The device has the beneficial effects that a floating crane is replaced for lowering the sea area bearing platform pile foundation reinforcement cage, and the situation that when the floating crane is adopted for lowering the reinforcement cage for sleeve connection construction, offshore wind and waves influence the floating crane, and then sleeves cannot be aligned and connected is avoided.
本发明公开了一种用于海域承台桩基钢筋笼的下放装置,包括设置于承台钢吊箱上方的支撑工字钢和焊接于支撑工字钢之间的连接工字钢,支撑工字钢上方的竖向支撑工字钢,竖向支撑工字钢之间的连接系,以及竖向支撑工字钢上方设置的走道结构和梯笼,走道结构四周设置防护网。本装置的有益效果是:代替浮吊进行海域承台桩基钢筋笼下放,避免了采用浮吊进行钢筋笼下放套筒连接施工时海上风、浪对浮吊影响而造成的套筒无法对准和连接施工的状况。
Lowering device for sea area bearing platform pile foundation reinforcement cage
The invention discloses a lowering device for a sea area bearing platform pile foundation reinforcement cage. The device comprises supporting I-beams arranged above a bearing platform steel hanging box, connecting I-beams welded between the supporting I-beams, vertical supporting I-beams above the supporting I-beams, a connecting system between the vertical supporting I-beams, and a walkway structure and an elevator cage arranged above the vertical supporting I-beams, wherein a protective net is arranged on the periphery of the walkway structure. The device has the beneficial effects that a floating crane is replaced for lowering the sea area bearing platform pile foundation reinforcement cage, and the situation that when the floating crane is adopted for lowering the reinforcement cage for sleeve connection construction, offshore wind and waves influence the floating crane, and then sleeves cannot be aligned and connected is avoided.
本发明公开了一种用于海域承台桩基钢筋笼的下放装置,包括设置于承台钢吊箱上方的支撑工字钢和焊接于支撑工字钢之间的连接工字钢,支撑工字钢上方的竖向支撑工字钢,竖向支撑工字钢之间的连接系,以及竖向支撑工字钢上方设置的走道结构和梯笼,走道结构四周设置防护网。本装置的有益效果是:代替浮吊进行海域承台桩基钢筋笼下放,避免了采用浮吊进行钢筋笼下放套筒连接施工时海上风、浪对浮吊影响而造成的套筒无法对准和连接施工的状况。
Lowering device for sea area bearing platform pile foundation reinforcement cage
一种用于海域承台桩基钢筋笼的下放装置
CAO HAIQING (author) / ZHAO LEI (author) / LI LINTING (author) / WANG WEI (author) / MEN QIANG (author) / CHEN QIANG (author) / CUI SHUJUN (author)
2020-11-10
Patent
Electronic Resource
Chinese
Large-diameter pile foundation reinforcement cage lowering frame
European Patent Office | 2024
|Adjustable orifice lifting appliance for lowering pile foundation reinforcement cage
European Patent Office | 2021
|Accurate locating method for lowering pile foundation steel reinforcement cage
European Patent Office | 2020
|Energy-saving pile foundation reinforcement cage lowering device and using method thereof
European Patent Office | 2023
|Construction method for secondary conversion lowering of pile foundation reinforcement cage
European Patent Office | 2024
|