Culvert structure and culvert construction process
The invention provides a culvert structure and a culvert construction process, a top plate and side walls are prefabricated, the top plate is transversely arranged, the two ends of the top plate extend downwards to form extending plates abutting against the tops of the side walls, the bottoms of the side walls extend towards the two sides to form supporting legs, and a bottom plate is arranged between the two supporting legs; during culvert construction, the prefabricated top plate and the prefabricated side walls are transported to a construction site, then the side walls and the top plate are sequentially installed, the bottom plate is poured on site after the side walls and the top plate are positioned, and then connection construction is conducted on gaps between the top plate and thebottom plate so that the top plate and the side walls can be fixedly connected. By prefabricating the structural member, the quality of the member can be more accurately controlled, the manufacturingstability of the member is improved, the cost is reduced, the culvert construction site is prevented from being influenced, the construction efficiency is improved, and the construction period is shortened.
一种涵洞结构及涵洞施工工艺,顶板和侧墙通过预制制作而成,顶板横向设置且两端向下延伸有抵于侧墙顶部的延伸板,侧墙的底部向两侧延伸有支撑脚,底板设置于两支撑脚之间;在涵洞的施工中先将预制的顶板和侧墙运输至施工现场,然后依次安装侧墙、顶板,待侧墙和顶板定位后再现场浇筑底板,接着对顶板与底板之间的缝隙进行连接施工,以使顶板和侧墙固定连接。通过结构件的预制,可以更准确地控制构件质量,并提高构件制作的稳定性、降低成本,避免影响涵洞施工现场,也有利于提高施工效率、缩短施工周期。
Culvert structure and culvert construction process
The invention provides a culvert structure and a culvert construction process, a top plate and side walls are prefabricated, the top plate is transversely arranged, the two ends of the top plate extend downwards to form extending plates abutting against the tops of the side walls, the bottoms of the side walls extend towards the two sides to form supporting legs, and a bottom plate is arranged between the two supporting legs; during culvert construction, the prefabricated top plate and the prefabricated side walls are transported to a construction site, then the side walls and the top plate are sequentially installed, the bottom plate is poured on site after the side walls and the top plate are positioned, and then connection construction is conducted on gaps between the top plate and thebottom plate so that the top plate and the side walls can be fixedly connected. By prefabricating the structural member, the quality of the member can be more accurately controlled, the manufacturingstability of the member is improved, the cost is reduced, the culvert construction site is prevented from being influenced, the construction efficiency is improved, and the construction period is shortened.
一种涵洞结构及涵洞施工工艺,顶板和侧墙通过预制制作而成,顶板横向设置且两端向下延伸有抵于侧墙顶部的延伸板,侧墙的底部向两侧延伸有支撑脚,底板设置于两支撑脚之间;在涵洞的施工中先将预制的顶板和侧墙运输至施工现场,然后依次安装侧墙、顶板,待侧墙和顶板定位后再现场浇筑底板,接着对顶板与底板之间的缝隙进行连接施工,以使顶板和侧墙固定连接。通过结构件的预制,可以更准确地控制构件质量,并提高构件制作的稳定性、降低成本,避免影响涵洞施工现场,也有利于提高施工效率、缩短施工周期。
Culvert structure and culvert construction process
一种涵洞结构及涵洞施工工艺
HUANG YAOQING (author) / WEI QINGWU (author) / ZHU YANGQIONG (author) / JI QINGCHUN (author) / WANG FAMING (author) / XU DUNMIN (author) / HUANG CHENG (author) / ZHANG BUWEI (author) / BAO YIKAI (author) / JIANG DAWEI (author)
2020-11-13
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Box culvert construction method and box culvert structure
European Patent Office | 2024
|CULVERT WALL STRUCTURE, AND CONSTRUCTION METHOD OF CULVERT WALL