A platform for research: civil engineering, architecture and urbanism
Water conservancy construction positioning method
The invention relates to a water conservancy construction positioning method which comprises the following steps: carrying out geographic position identification on each pipeline line and calibratingthe strength information of a corresponding pipeline area, and setting the line matrix fi(Di, Cm, Gi) of the pipeline, wherein Di refers to a pipeline diameter during the corresponding construction process, Cm refers to the average strength value of the pipeline area during the corresponding construction process, and Gi refers to the coordinate information of a central position of a correspondingpipeline; and when determining the average strength value of the pipeline area during the corresponding construction process, first dividing the construction area of the pipeline in each pipeline lineinto a first area and a second area arranged on the lower side of the pipeline and a third area arranged on the upper side of the pipeline. The water conservancy construction positioning method can position based on the geographic information and also can position according to the strength parameter of the pipeline line.
本发明涉及一种水利施工定位方法,对每条管路线路进行地理位置标识与对应管道区域的强度信息进行标定,设定管道线路矩阵fi(Di,Cm,Gi),其中,Di表示对应施工过程中的管道直径,Cm表示对应施工过程中的管道区域平均强度值,Gi表示对应管道的中心位置坐标信息;在确定对应施工过程中的管道区域平均强度值时,首先对每条管路线路的管道的施工区域,划分为设置在管道下侧的第一区域、以及第二区域,以及设置在管道上侧的第三区域。本发明水利施工定位方法,能够基于地理信息定位,还能够根据管路线路的强度参数定位。
Water conservancy construction positioning method
The invention relates to a water conservancy construction positioning method which comprises the following steps: carrying out geographic position identification on each pipeline line and calibratingthe strength information of a corresponding pipeline area, and setting the line matrix fi(Di, Cm, Gi) of the pipeline, wherein Di refers to a pipeline diameter during the corresponding construction process, Cm refers to the average strength value of the pipeline area during the corresponding construction process, and Gi refers to the coordinate information of a central position of a correspondingpipeline; and when determining the average strength value of the pipeline area during the corresponding construction process, first dividing the construction area of the pipeline in each pipeline lineinto a first area and a second area arranged on the lower side of the pipeline and a third area arranged on the upper side of the pipeline. The water conservancy construction positioning method can position based on the geographic information and also can position according to the strength parameter of the pipeline line.
本发明涉及一种水利施工定位方法,对每条管路线路进行地理位置标识与对应管道区域的强度信息进行标定,设定管道线路矩阵fi(Di,Cm,Gi),其中,Di表示对应施工过程中的管道直径,Cm表示对应施工过程中的管道区域平均强度值,Gi表示对应管道的中心位置坐标信息;在确定对应施工过程中的管道区域平均强度值时,首先对每条管路线路的管道的施工区域,划分为设置在管道下侧的第一区域、以及第二区域,以及设置在管道上侧的第三区域。本发明水利施工定位方法,能够基于地理信息定位,还能够根据管路线路的强度参数定位。
Water conservancy construction positioning method
一种水利施工定位方法
XU QINGQI (author) / HE XINBIN (author) / LIN LIUMEI (author) / CHEN LIYING (author) / XU ZHIYUE (author)
2020-11-13
Patent
Electronic Resource
Chinese
Sludge-preventing positioning method for water conservancy construction
European Patent Office | 2024
|