Construction method of diaphragm wall of underground facility
The invention discloses a construction method of a diaphragm wall of an underground facility. According to the technical scheme, the construction method comprises the following steps: constructing diaphragm walls on the two sides of the far end of a cable trench; forming a trench below the cable trench, and constructing diaphragm walls on the two sides of the cable trench; underpinning undergroundfacilities and excavating auxiliary foundation pits; manufacturing and installing a local prefabricated guiding wall, installing a segmented reinforcement cage positioning device and manufacturing and installing a reinforcement cage guiding device; conveying the segmented reinforcement cage positioning device to the position above the guiding device, lowering a segmented reinforcement cage; and erecting a diaphragm wall formwork, and pouring concrete. The segmented reinforcement cage is transported, so that convenience is provided for installation of the reinforcement cage; and the strength and rigidity of the diaphragm wall after construction can be guaranteed.
本发明公开了一种地下设施下地连墙施工方法,其技术方案为:包括:施工电缆沟远端两侧地连墙;成槽电缆沟以下沟槽,施工电缆沟两侧地连墙;托换地下设施,开挖辅助基坑;制作并安装局部预制导墙,安装分节钢筋笼就位装置,制作并安装钢筋笼导正装置;分节钢筋笼经就位装置运输至导正装置上方,下放分节钢筋笼;支设地连墙模板,并浇筑混凝土。本发明通过运输分节钢筋笼,为钢筋笼安装提供了便利;能够保证施工后地下连续墙的强度及刚度。
Construction method of diaphragm wall of underground facility
The invention discloses a construction method of a diaphragm wall of an underground facility. According to the technical scheme, the construction method comprises the following steps: constructing diaphragm walls on the two sides of the far end of a cable trench; forming a trench below the cable trench, and constructing diaphragm walls on the two sides of the cable trench; underpinning undergroundfacilities and excavating auxiliary foundation pits; manufacturing and installing a local prefabricated guiding wall, installing a segmented reinforcement cage positioning device and manufacturing and installing a reinforcement cage guiding device; conveying the segmented reinforcement cage positioning device to the position above the guiding device, lowering a segmented reinforcement cage; and erecting a diaphragm wall formwork, and pouring concrete. The segmented reinforcement cage is transported, so that convenience is provided for installation of the reinforcement cage; and the strength and rigidity of the diaphragm wall after construction can be guaranteed.
本发明公开了一种地下设施下地连墙施工方法,其技术方案为:包括:施工电缆沟远端两侧地连墙;成槽电缆沟以下沟槽,施工电缆沟两侧地连墙;托换地下设施,开挖辅助基坑;制作并安装局部预制导墙,安装分节钢筋笼就位装置,制作并安装钢筋笼导正装置;分节钢筋笼经就位装置运输至导正装置上方,下放分节钢筋笼;支设地连墙模板,并浇筑混凝土。本发明通过运输分节钢筋笼,为钢筋笼安装提供了便利;能够保证施工后地下连续墙的强度及刚度。
Construction method of diaphragm wall of underground facility
一种地下设施下地连墙施工方法
LI LIANXIANG (author) / SURIGALATU (author) / SONG XIAOZHONG (author) / LI WEITONG (author) / YU KEMENG (author) / LI HONGBO (author)
2020-11-13
Patent
Electronic Resource
Chinese
Construction method of underground diaphragm wall and underground diaphragm wall
European Patent Office | 2020
|Underground diaphragm wall joint and construction method of underground diaphragm wall
European Patent Office | 2023
|