A platform for research: civil engineering, architecture and urbanism
Concrete winter curing construction method
The invention discloses a concrete winter curing construction method. The concrete winter curing construction method comprises the steps that 1, concrete is manufactured and transported; 2, the concrete is poured and tamped; 3, a supporting structure is built to form an operation space; 4, heat preservation curing is conducted on the concrete in the operation space; 5, temperature and humidity measuring points are arranged in the operation space; 6, the temperature of a concrete core part, the temperature of the concrete surface and the temperature of the operation space are monitored in realtime; and 7, after the concrete strength is measured, mold removal is conducted. According to the concrete winter curing construction method, the advantages of a greenhouse method and a steam curing method in traditional winter concrete curing construction are integrated, the curing effect is good, and the purposes of economy, convenience and efficient curing are achieved.
本发明公开了一种混凝土冬季养护施工方法,包括:步骤1,伴制、运输混凝土;步骤2,浇筑、捣实混凝土;步骤3,搭建支撑结构形成作业空间;步骤4,在作业空间内对混凝土进行保温养护;步骤5,在作业空间内布置测温、测湿点;步骤6,实时监测混凝土芯部、混凝土表面以及作业空间的温度;步骤7,测定混凝土强度后拆模。本发明综合了传统冬季混凝土养护施工中暖棚法和蒸汽养护法的优点,养护效果良好,达到经济、便捷、高效养护的目的。
Concrete winter curing construction method
The invention discloses a concrete winter curing construction method. The concrete winter curing construction method comprises the steps that 1, concrete is manufactured and transported; 2, the concrete is poured and tamped; 3, a supporting structure is built to form an operation space; 4, heat preservation curing is conducted on the concrete in the operation space; 5, temperature and humidity measuring points are arranged in the operation space; 6, the temperature of a concrete core part, the temperature of the concrete surface and the temperature of the operation space are monitored in realtime; and 7, after the concrete strength is measured, mold removal is conducted. According to the concrete winter curing construction method, the advantages of a greenhouse method and a steam curing method in traditional winter concrete curing construction are integrated, the curing effect is good, and the purposes of economy, convenience and efficient curing are achieved.
本发明公开了一种混凝土冬季养护施工方法,包括:步骤1,伴制、运输混凝土;步骤2,浇筑、捣实混凝土;步骤3,搭建支撑结构形成作业空间;步骤4,在作业空间内对混凝土进行保温养护;步骤5,在作业空间内布置测温、测湿点;步骤6,实时监测混凝土芯部、混凝土表面以及作业空间的温度;步骤7,测定混凝土强度后拆模。本发明综合了传统冬季混凝土养护施工中暖棚法和蒸汽养护法的优点,养护效果良好,达到经济、便捷、高效养护的目的。
Concrete winter curing construction method
一种混凝土冬季养护施工方法
LI DONGSHUN (author) / LIANG YUNSHENG (author) / DU GUOJUN (author) / DONG ZHIWEI (author) / GUO WEI (author) / DU NING (author) / MA YONGJUN (author) / LIU YONG (author) / GUO LIYA (author) / HUANG SHENG (author)
2020-11-13
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1963
Special-shaped main tower construction section concrete winter curing method
European Patent Office | 2023
|Concrete constant-temperature heating curing system for winter construction
European Patent Office | 2024
|European Patent Office | 2021
|